{"id":17389,"date":"2023-06-26T04:49:40","date_gmt":"2023-06-26T04:49:40","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=17389"},"modified":"2023-06-27T04:52:16","modified_gmt":"2023-06-27T04:52:16","slug":"1000-mw-of-renewable-energy-and-2000-mw-of-pumped-storage-projects-to-come-up-in-odisha","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/1000-mw-of-renewable-energy-and-2000-mw-of-pumped-storage-projects-to-come-up-in-odisha\/","title":{"rendered":"1,000 MW of renewable energy and 2,000 MW of pumped storage projects to come up in Odisha"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/17389?pdf=17389\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/renewable-energy-to-supply-turbines-for-100-mw-wind-farm-in-gujarat-1.jpg\" \/><\/p>\n<p>An first agreement to create 1,000 MW of renewable energy and 2,000 MW of pumped storage projects in Odisha has been signed by the state-owned NHPC Ltd.<\/p>\n<p>According to a power ministry release, the MoU signed with GRIDCO Ltd. calls for the establishment of renewable energy projects (Ground-Mounted Solar Projects\/Floating Solar Projects) of at least 1,000 MW as well as self-identified pumped storage projects of at least 2,000 MW in the state.<\/p>\n<p>The MoU was signed on 23rd June 2023, by Executive Director (Strategy Business Development and Consultancy), NHPC, Rajat Gupta and Managing Director, GRIDCO Limited, Trilochan Panda, it stated.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report An first agreement to create 1,000 MW of renewable energy and 2,000 MW of pumped storage projects in Odisha has been signed by the state-owned NHPC Ltd. According to a&#8230; <\/p>\n","protected":false},"author":1,"featured_media":4202,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163,141],"tags":[2462],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/renewable-energy-to-supply-turbines-for-100-mw-wind-farm-in-gujarat-1.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17389"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=17389"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17389\/revisions"}],"predecessor-version":[{"id":17390,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17389\/revisions\/17390"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/4202"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=17389"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=17389"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=17389"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}