{"id":17346,"date":"2023-06-22T04:54:56","date_gmt":"2023-06-22T04:54:56","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=17346"},"modified":"2023-06-23T04:58:00","modified_gmt":"2023-06-23T04:58:00","slug":"goa-plans-to-begin-four-laning-of-nh-748-from-anmod-to-panaji","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/goa-plans-to-begin-four-laning-of-nh-748-from-anmod-to-panaji\/","title":{"rendered":"Goa plans to begin four-laning of NH 748 from Anmod to Panaji"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/17346?pdf=17346\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/06\/NH-44.jpg\" \/><\/p>\n<p>With the final stretch at Tuem currently under construction, the four-laning of national highways that was started in 2016 from Patradevi to Bambolim is anticipated to be finished by October this year.<\/p>\n<p>As construction draws to a close, Goa plans to begin four-laning the remaining sections of NH 748 (formerly NH 4A), which runs from Anmod to Panaji.<\/p>\n<p>A four-lane version of the remaining 50 km of the route is expected to cost roughly Rs 2,000 crore.<\/p>\n<p>According to officials, land acquisition has already started on this section, and the alignment from Farmagudi to Corlim has been approved.<\/p>\n<p>This includes the length of Bhoma, where villagers are opposing the construction of the four lanes.<\/p>\n<p>However, officials said that a bypass, as suggested by the locals, is not feasible and the four-laning will be carried out along the existing road passing through Bhoma, ensuring that minimal houses are lost to the work.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report With the final stretch at Tuem currently under construction, the four-laning of national highways that was started in 2016 from Patradevi to Bambolim is anticipated to be finished by October&#8230; <\/p>\n","protected":false},"author":1,"featured_media":17295,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[1891,163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/06\/NH-44.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17346"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=17346"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17346\/revisions"}],"predecessor-version":[{"id":17347,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17346\/revisions\/17347"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/17295"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=17346"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=17346"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=17346"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}