{"id":173,"date":"2021-09-15T11:13:36","date_gmt":"2021-09-15T11:13:36","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=173"},"modified":"2021-09-20T05:27:00","modified_gmt":"2021-09-20T05:27:00","slug":"new-projects-by-arcelormittal-nippon-steel-india-associated-colours-industries-ns-instruments-india-techno-electric-and-engineering-and-more","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/new-projects-by-arcelormittal-nippon-steel-india-associated-colours-industries-ns-instruments-india-techno-electric-and-engineering-and-more\/","title":{"rendered":"New Projects by ArcelorMittal Nippon Steel India, Associated Colours Industries, NS Instruments India, Techno Electric and Engineering and more&#8230;"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/173?pdf=173\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<h5><strong>AMNS&#8217; New Captive Riverine Jetty Development<\/strong><\/h5>\n<p>ArcelorMittal Nippon Steel is planning to take up New captive riverine jetty development in Kujang, Jagatsinghapur, Orissa. The project involves development of captive riverine jetty of material handling capacity of 4.5 MTPA on the bank of river Mahanadi. The estimated cost of the project is Rs.1516 million. As of September 2021, environment clearance for the project is underway. The State-Level Single Window Clearance Authority (SLSWCA) has approved the project.<\/p>\n<h5><strong>NS Instruments India&#8217;s Automotive Components Mfg. Unit Expansion<\/strong><\/h5>\n<p>NS Instruments India is planning to take up a Automotive components manufacturing unit expansion in Chilamanthur Village, Varadaiahpalem Taluk,Chittoor, Andhra Pradesh. The project involves enhance the manufacturing of 4 wheeler instrument meter 12,90,000 Nos\/Year, 2 wheeler instrument meter 25,20,000 Nos\/Year, Etc. The project is estimated to cost Rs.5063.6 million. As of September 2021, the company has received consent from the state pollution control authorities to establish the project.<\/p>\n<h1 style=\"margin: 0cm; margin-bottom: .0001pt;\"><span style=\"font-size: 12.0pt; color: #333333; background: white;\">To access all new projects covered today, download the report<\/span><\/h1>\n<p><img src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/09\/DPN-Template-image.jpg\" \/><\/p>\n<p><a href=\"https:\/\/www.newprojectstracker.com\/online\">Download Daily Projects Report \u2013 Issue No : 084<\/a><\/p>\n<p>The Daily Project Report compiled from new projects updated on the previous day is sent to all paid subscribers and has 15 New Projects in Energy, Infrastructure, Chemicals, Textiles, Paper, Cement, Steel, Water Treatment and other Manufacturing Projects in India<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report AMNS&#8217; New Captive Riverine Jetty Development ArcelorMittal Nippon Steel is planning to take up New captive riverine jetty development in Kujang, Jagatsinghapur, Orissa. The project involves development of captive riverine&#8230; <\/p>\n","protected":false},"author":1,"featured_media":174,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[10],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/09\/DPN-Template-image.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/173"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=173"}],"version-history":[{"count":3,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/173\/revisions"}],"predecessor-version":[{"id":290,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/173\/revisions\/290"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/174"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=173"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=173"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=173"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}