{"id":17244,"date":"2023-06-17T04:52:54","date_gmt":"2023-06-17T04:52:54","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=17244"},"modified":"2023-06-19T04:57:24","modified_gmt":"2023-06-19T04:57:24","slug":"leading-infraprojects-company-emerges-l1-for-ham-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/leading-infraprojects-company-emerges-l1-for-ham-project\/","title":{"rendered":"Leading infraprojects company emerges L1 for HAM project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/17244?pdf=17244\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/06\/Leading-infraprojects-company-emerges-L1-for-HAM-project.png\" \/><\/p>\n<p>G R Infraprojects Limited won the contract for the &#8220;Four laning of NH 530B from Kasganj Bypass End (Existing Km. 150.100 of NH 530B\/Design Km. 123.100) to Chandan Nagar (Existing Km. 96.200 of NH 530B\/Design Km. 179.500) section of NH 530B in the State of Uttar Pradesh on HAM mode &#8211; Package 3&#8221;<\/p>\n<p>Cost of the project under bid is Rs. 1085.47 crore.<\/p>\n<p>G R Infraprojects Limited is one of the fastest growing organizations in the Indian infrastructure sector, with over 25 years of legacy.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report G R Infraprojects Limited won the contract for the &#8220;Four laning of NH 530B from Kasganj Bypass End (Existing Km. 150.100 of NH 530B\/Design Km. 123.100) to Chandan Nagar (Existing&#8230; <\/p>\n","protected":false},"author":1,"featured_media":17245,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[2006,163],"tags":[2257],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/06\/Leading-infraprojects-company-emerges-L1-for-HAM-project.png","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17244"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=17244"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17244\/revisions"}],"predecessor-version":[{"id":17246,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17244\/revisions\/17246"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/17245"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=17244"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=17244"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=17244"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}