{"id":17078,"date":"2023-06-14T04:45:11","date_gmt":"2023-06-14T04:45:11","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=17078"},"modified":"2023-06-15T04:48:44","modified_gmt":"2023-06-15T04:48:44","slug":"construction-works-in-nh-packages-to-be-completed-by-this-deadline","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/construction-works-in-nh-packages-to-be-completed-by-this-deadline\/","title":{"rendered":"Construction works in NH packages to be completed by this deadline"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/17078?pdf=17078\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/Naitional-Highway.jpg\" \/><\/p>\n<p>By December of next year, National Highway (NH) 415 construction under Packages B and C should be finished.<\/p>\n<p>Even though the portion of Package B between Papu Nallah and Nirjuli is only 11.3 km long, construction on it is moving along at a glacial rate.<\/p>\n<p>A resident of the Yupia trijunction area said that \u201cThe executing agencies should expedite their work and try to complete the work before the arrival of the monsoon season.\u201d<\/p>\n<p>A resident of Lekhi expressed dissatisfaction over the dusty road and said that \u201cthe agencies concerned should at least come up with a plan to sprinkle water on the dusty road,\u201d adding that two-wheeler riders are largely affected by dust on sunny days.<\/p>\n<p>The stretch under Package C, from Nirjuli to Banderdewa, which is 7.3 kms long (including an approximately 1.1 km long viaduct), and is to be completed by August 2024, \u201cis in progress, with 54.36 percent of the work already done,\u201d PHED Highway EE Bini Pelen informed.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report By December of next year, National Highway (NH) 415 construction under Packages B and C should be finished. Even though the portion of Package B between Papu Nallah and Nirjuli&#8230; <\/p>\n","protected":false},"author":1,"featured_media":4169,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[1891,163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/01\/Naitional-Highway.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17078"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=17078"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17078\/revisions"}],"predecessor-version":[{"id":17079,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/17078\/revisions\/17079"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/4169"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=17078"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=17078"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=17078"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}