{"id":16970,"date":"2023-06-09T05:18:42","date_gmt":"2023-06-09T05:18:42","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=16970"},"modified":"2023-06-10T05:24:01","modified_gmt":"2023-06-10T05:24:01","slug":"cabinet-gives-nod-for-metro-extension-from-huda-city-centre-to-cyber-city","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/cabinet-gives-nod-for-metro-extension-from-huda-city-centre-to-cyber-city\/","title":{"rendered":"Cabinet gives nod for Metro extension from HUDA city centre to Cyber city"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/16970?pdf=16970\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/06\/Surat-Metro-project-1.jpg\" \/><\/p>\n<p>According to Union Minister Piyush Goyal, the Union Cabinet has approved metro connectivity from Gurugram&#8217;s HUDA City Centre to Cyber City. There will be 27 stations along the route, which will be across a distance of 28.50 kilometres.<\/p>\n<p>According to Goyal, the project will end up costing approximately Rs 5,450 crore in total.<\/p>\n<p>The entire project will be elevated, and access to the depot will be provided by a spur (side line) from Basai village.<\/p>\n<p>The project will be carried out by Haryana Mass Rapid Transport Corporation Limited (HMRTC) and is expected to be finished four years after it has been approved.<\/p>\n<p>HMRTC will be set up as a 50:50 special purpose vehicle (SPV) of the Central and Haryana governments after a sanction order is issued.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report According to Union Minister Piyush Goyal, the Union Cabinet has approved metro connectivity from Gurugram&#8217;s HUDA City Centre to Cyber City. There will be 27 stations along the route, which&#8230; <\/p>\n","protected":false},"author":1,"featured_media":16933,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163,174],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/06\/Surat-Metro-project-1.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16970"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=16970"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16970\/revisions"}],"predecessor-version":[{"id":16971,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16970\/revisions\/16971"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/16933"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=16970"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=16970"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=16970"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}