{"id":16938,"date":"2023-06-08T04:56:03","date_gmt":"2023-06-08T04:56:03","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=16938"},"modified":"2023-06-09T05:01:06","modified_gmt":"2023-06-09T05:01:06","slug":"loi-granted-for-40-mw-hybrid-project-in-gujarat","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/loi-granted-for-40-mw-hybrid-project-in-gujarat\/","title":{"rendered":"LoI granted for 40 MW hybrid project in Gujarat"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/16938?pdf=16938\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/Luminous-to-construct-Indias-first-green-solar-panel-factory-in-Uttarakhand.jpg\" \/><\/p>\n<p>A private participant has provided a letter of intent (LoI) for the development of a 40 megawatt hybrid green energy plant in Gujarat, according to KPI Green Energy.<\/p>\n<p>The company stated in a regulatory filing that the capacity consists of 18.5 MW of solar and 21.50 MW of wind.<\/p>\n<p>&#8220;KPI Green has received a new largest single LoI for executing Wind-Solar Hybrid Power Project of 40 MW capacity from Anupam Rasayan India, Surat under &#8220;Captive Power Producer (CPP)&#8221; business segment of the company,&#8221; it said.<\/p>\n<p>This LoI is a significant milestone for the company, showcasing its strong position in the renewable energy market.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report A private participant has provided a letter of intent (LoI) for the development of a 40 megawatt hybrid green energy plant in Gujarat, according to KPI Green Energy. The company&#8230; <\/p>\n","protected":false},"author":1,"featured_media":14353,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163,146],"tags":[1963,363],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/Luminous-to-construct-Indias-first-green-solar-panel-factory-in-Uttarakhand.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16938"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=16938"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16938\/revisions"}],"predecessor-version":[{"id":16939,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16938\/revisions\/16939"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/14353"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=16938"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=16938"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=16938"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}