{"id":16908,"date":"2023-06-07T06:22:47","date_gmt":"2023-06-07T06:22:47","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=16908"},"modified":"2023-06-08T06:31:36","modified_gmt":"2023-06-08T06:31:36","slug":"loa-awarded-for-6-70-km-long-treated-water-tunnel-in-raigad-maharashtra","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/loa-awarded-for-6-70-km-long-treated-water-tunnel-in-raigad-maharashtra\/","title":{"rendered":"LOA awarded for 6.70 km long treated water tunnel in Raigad, Maharashtra"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/16908?pdf=16908\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/06\/Patel-Engineering.jpg\" \/><\/p>\n<p>The City and Industrial Development Corporation (CIDCO) has given Patel Engineering a letter of acceptance (LOA) to build a 6.70 km long treated water tunnel and related works in Raigad district, Maharashtra.<\/p>\n<p>The infrastructure company stated in a statement on Tuesday that there will be no joint venture partnerships used to carry out the Rs 519.50 crore water tunnel project.<\/p>\n<p>Rupen Patel, Chairman &amp; Managing Director, Patel Engineering Limited, said it is a prestigious project for the company. &#8220;This project demonstrates our technical prowess and engineering skills, along with excellent execution capabilities.&#8221;<\/p>\n<p>The project is expected to be completed within 60 months, as stipulated in the bid. With expertise in tunnelling, underground works for hydroelectric and infrastructure development, the company is well-positioned to successfully complete the project within the stipulated time frame.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The City and Industrial Development Corporation (CIDCO) has given Patel Engineering a letter of acceptance (LOA) to build a 6.70 km long treated water tunnel and related works in Raigad&#8230; <\/p>\n","protected":false},"author":1,"featured_media":16909,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[1898,163],"tags":[1567],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/06\/Patel-Engineering.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16908"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=16908"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16908\/revisions"}],"predecessor-version":[{"id":16910,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16908\/revisions\/16910"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/16909"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=16908"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=16908"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=16908"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}