{"id":16835,"date":"2023-06-01T05:22:32","date_gmt":"2023-06-01T05:22:32","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=16835"},"modified":"2023-06-02T05:27:25","modified_gmt":"2023-06-02T05:27:25","slug":"sjvn-to-develop-669-mw-hydro-electric-project-in-nepal","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/sjvn-to-develop-669-mw-hydro-electric-project-in-nepal\/","title":{"rendered":"SJVN to develop 669 MW Hydro Electric Project in Nepal"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/16835?pdf=16835\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/sjvn.jpg\" \/><\/p>\n<p>SJVN Ltd., a state-owned business in India, announced in a regulatory filing that it has signed a project development agreement for the 669 MW Lower Arun Hydroelectric Project in Nepal.<\/p>\n<p>The business wants to complete 5,000 MW worth of projects in Nepal by 2030.<\/p>\n<p>In a regulatory filing, the company said, \u201cThe project shall be constructed in five years at a cost of Rs 5,792 crore with a levelised tariff of Rs 4.99 per unit.\u201d<\/p>\n<p>The project will be developed on Boot basis and on completion it will generate 2,901 million units of energy annually.<\/p>\n<p>In addition to this, the company is also developing 217 KM long associated Transmission Network for power evacuation and export to India, the company said in a BSE filing.<\/p>\n<p>The 669 MW Lower Arun Hydro Electric Project is in Sankhuwasabha and Bhojpur districts of Nepal.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report SJVN Ltd., a state-owned business in India, announced in a regulatory filing that it has signed a project development agreement for the 669 MW Lower Arun Hydroelectric Project in Nepal&#8230;. <\/p>\n","protected":false},"author":1,"featured_media":2474,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[1945],"tags":[283],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/11\/sjvn.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16835"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=16835"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16835\/revisions"}],"predecessor-version":[{"id":16836,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16835\/revisions\/16836"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/2474"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=16835"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=16835"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=16835"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}