{"id":1671,"date":"2021-09-06T00:00:14","date_gmt":"2021-09-06T00:00:14","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=1671"},"modified":"2021-10-21T05:06:47","modified_gmt":"2021-10-21T05:06:47","slug":"new-projects-by-kerala-road-fund-board-bharat-petroleum-corporation-pidilite-industries-and-more","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/new-projects-by-kerala-road-fund-board-bharat-petroleum-corporation-pidilite-industries-and-more\/","title":{"rendered":"New Projects by Kerala Road Fund Board, Bharat Petroleum Corporation, Pidilite Industries and more&#8230;"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/1671?pdf=1671\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><strong>Ambuja Cements&#8217; New Clicker Grinding Facility<\/strong><\/p>\n<p>Ambuja Cement is planning to take up new clicker grinding facility in Marwar Mundwa, Nagaur, Rajasthan . The project involves setting up 1.4 million tonne clinker capacity, grinding facility of 1.8 mt besides a captive power plant and waste heat recovery system. The estimated cost of the project is Rs.9600 million. On December 2018, environment clearance for the project is underway. As of September 2021, project involves inaugurated the trial run of Ambuja Cements Limited&#8217;s Rs 2,3500 Million greenfield integrated plant.<\/p>\n<p><strong>MoRTH&#8217;s New Two Lane Project<\/strong><\/p>\n<p>National Highways &amp; Infrastructure Development Corporation is planning to take up new two lane project in Jammu &amp; Kashmir. The project involves construction upgradation (realignment) with twolane with paved shoulder from 111.06 km (at Chhatroo 140.87 km on NH-244) to 126.75 km (start of east side portal of Vailoo tunnel) of length 15.683 km on NH- 244 in Jammu &amp; Kashmir on engineering, procurement and construction (EPC) mode. The estimated cost of the project is Rs.3469.3 million. As of September 2021, NHIDCL has invited bids for road upgardation in the Union Territory of Jammu &amp; Kashmir.<\/p>\n<p><strong>To access all new projects covered today, download the report<\/strong><\/p>\n<p><img class=\"alignnone  wp-image-1672\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/image-78-232x300.jpg\" alt=\"\" width=\"466\" height=\"603\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/image-78-232x300.jpg 232w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/image-78-791x1024.jpg 791w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/image-78-768x994.jpg 768w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/image-78-1187x1536.jpg 1187w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/image-78-1583x2048.jpg 1583w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/image-78.jpg 1700w\" sizes=\"(max-width: 466px) 100vw, 466px\" \/><\/p>\n<p><strong><a href=\"https:\/\/www.newprojectstracker.com\/online\">Download Daily Projects Report \u2013 Issue No :078<\/a><\/strong><\/p>\n<p>The Daily Project Report compiled from new projects updated on the previous day is sent to all paid subscribers and has 15 New Projects in Energy, Infrastructure, Chemicals, Textiles, Paper, Cement, Steel, Water Treatment and other Manufacturing Projects in India<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Ambuja Cements&#8217; New Clicker Grinding Facility Ambuja Cement is planning to take up new clicker grinding facility in Marwar Mundwa, Nagaur, Rajasthan . The project involves setting up 1.4 million&#8230; <\/p>\n","protected":false},"author":1,"featured_media":1672,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[10],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/image-78.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/1671"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=1671"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/1671\/revisions"}],"predecessor-version":[{"id":1676,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/1671\/revisions\/1676"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/1672"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=1671"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=1671"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=1671"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}