{"id":16694,"date":"2023-05-25T04:43:22","date_gmt":"2023-05-25T04:43:22","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=16694"},"modified":"2023-05-26T04:47:23","modified_gmt":"2023-05-26T04:47:23","slug":"power-major-commences-work-for-manufacturing-unit-in-andhra-pradesh","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/power-major-commences-work-for-manufacturing-unit-in-andhra-pradesh\/","title":{"rendered":"Power major commences work for manufacturing unit in Andhra Pradesh"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/16694?pdf=16694\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/GREEN-HYDROGEN.jpg\" \/><\/p>\n<p>The establishment of manufacturing facilities for a hydrogen hub in Andhra Pradesh has already started thanks to the power company NTPC.<\/p>\n<p>The facility will enable equipment production, green hydrogen production, and export in addition to green ammonia.<\/p>\n<p>For the advancement of a hydrogen hub near Vishakhapatnam, the state-owned enterprise and the government of Andhra Pradesh have signed a non-binding Memorandum of Understanding.<\/p>\n<p>Massive investments are being made by NTPC in energy storage and hydrogen technologies.<\/p>\n<p>In Andhra Pradesh, development on the hydrogen hub has recently begun.<\/p>\n<p>A storage tender for 9000 MWh has also been launched.<\/p>\n<p>NTPC has an operational renewable energy capacity of 3.2 GW and the overall capacity under execution has surpassed 20GW with various agreements arranged.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The establishment of manufacturing facilities for a hydrogen hub in Andhra Pradesh has already started thanks to the power company NTPC. The facility will enable equipment production, green hydrogen production,&#8230; <\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[1892,163,1893],"tags":[237],"jetpack_featured_media_url":"","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16694"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=16694"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16694\/revisions"}],"predecessor-version":[{"id":16695,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16694\/revisions\/16695"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=16694"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=16694"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=16694"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}