{"id":16614,"date":"2023-05-22T04:49:07","date_gmt":"2023-05-22T04:49:07","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=16614"},"modified":"2023-05-23T04:54:29","modified_gmt":"2023-05-23T04:54:29","slug":"surat-airport-terminal-building-extension-nears-completion","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/surat-airport-terminal-building-extension-nears-completion\/","title":{"rendered":"Surat Airport terminal building extension nears completion"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/16614?pdf=16614\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/Airport-1.jpg\" \/><\/p>\n<p>With 94% of the work finished, the development work for the expansion of the Terminal Building at Surat International Airport is in its final stages.<\/p>\n<p>The Airports Authority of India (AAI), which oversees the Surat Airport, is currently upgrading and developing the airport&#8217;s infrastructure.<\/p>\n<p>With a total expenditure of Rs. 353.25 crore, the project entails the enlargement of the Terminal Building, the Apron, and the building of a Parallel Taxi Track.<\/p>\n<p>The development of the Terminal Building is nearing completion, with 94% of the work already finished. The project, valued at Rs. 138.48 crore, has been progressing steadily.<\/p>\n<p>Simultaneously, The extension of the apron and construction of a parallel taxi track is nearly 72% completed. This particular project has been awarded at a cost of \u20b963.13 crore.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report With 94% of the work finished, the development work for the expansion of the Terminal Building at Surat International Airport is in its final stages. The Airports Authority of India&#8230; <\/p>\n","protected":false},"author":1,"featured_media":1874,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[8,1891,163],"tags":[74],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/Airport-1.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16614"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=16614"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16614\/revisions"}],"predecessor-version":[{"id":16615,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16614\/revisions\/16615"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/1874"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=16614"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=16614"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=16614"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}