{"id":16560,"date":"2023-05-18T10:53:06","date_gmt":"2023-05-18T10:53:06","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=16560"},"modified":"2023-05-19T10:55:02","modified_gmt":"2023-05-19T10:55:02","slug":"tenders-floated-for-hyderabad-airport-metro-lines-civil-and-system-contract","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/tenders-floated-for-hyderabad-airport-metro-lines-civil-and-system-contract\/","title":{"rendered":"Tenders floated for Hyderabad Airport Metro Line&#8217;s Civil and System Contract"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/16560?pdf=16560\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<div dir=\"auto\"><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/metro.jpg\" \/><\/div>\n<div dir=\"auto\">Hyderabad Airport Metro Ltd. (HAML) issued an invitation for bids for the 31 km Airport Express Line&#8217;s civil construction and system procurement.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">The Hyderabad Metro Phase 2 project will build this semi-high-speed rail line around the Outer Ring Road (ORR) of Hyderabad to connect Mindspace Junction with Rajiv Gandhi International (Shamshabad) Airport via 10 stations-9 elevated and 1 underground.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">At the airport inside Hyderabad Aerocity, trains on this route will run on an elevated bridge for 28.5 km and underground for 2.5 km. With trains moving at a top speed of 120 kmph, it is anticipated that it will take 20 minutes to travel from Gachibowli in the city to RGIA.<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Hyderabad Airport Metro Ltd. (HAML) issued an invitation for bids for the 31 km Airport Express Line&#8217;s civil construction and system procurement. The Hyderabad Metro Phase 2 project will build&#8230; <\/p>\n","protected":false},"author":1,"featured_media":13030,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[296],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/metro.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16560"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=16560"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16560\/revisions"}],"predecessor-version":[{"id":16561,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16560\/revisions\/16561"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/13030"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=16560"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=16560"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=16560"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}