{"id":16511,"date":"2023-05-16T10:57:53","date_gmt":"2023-05-16T10:57:53","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=16511"},"modified":"2023-05-18T11:00:14","modified_gmt":"2023-05-18T11:00:14","slug":"major-update-on-bridge-across-river-zuari","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/major-update-on-bridge-across-river-zuari\/","title":{"rendered":"Major update on bridge across River Zuari"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/16511?pdf=16511\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<div dir=\"auto\"><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/06\/Gadkari-updates-about-Cable-Stayed-Bridge-across-River-Chambal.jpg\" \/><\/div>\n<div dir=\"auto\">Construction of Approaches in Ch.531\/934 to Ch.536\/250 for Bridge Across River Zuari on NH-17\/NH-66 on Panjim-Mangalore Section in the State of Goa- (Package III) has been completed, and Dilip Buildcon has been awarded a completion certificate.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">The authority has issued a Completion Certificate and deemed the project ready for commercial operation as of December 31, 2022. The project will cost 417.60 crore rupees.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">Through a joint venture with Dilip Buildcon called Mostobudivelnyi Zahin No. 112, the company finished the project.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">Construction projects in the roads and irrigation sectors are Dilip Buildcon&#8217;s primary business. They specialise in building city roads, state and federal highways, culverts and bridges.<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Construction of Approaches in Ch.531\/934 to Ch.536\/250 for Bridge Across River Zuari on NH-17\/NH-66 on Panjim-Mangalore Section in the State of Goa- (Package III) has been completed, and Dilip Buildcon&#8230; <\/p>\n","protected":false},"author":1,"featured_media":8996,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[169],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/06\/Gadkari-updates-about-Cable-Stayed-Bridge-across-River-Chambal.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16511"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=16511"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16511\/revisions"}],"predecessor-version":[{"id":16512,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16511\/revisions\/16512"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/8996"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=16511"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=16511"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=16511"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}