{"id":16487,"date":"2023-05-15T04:22:48","date_gmt":"2023-05-15T04:22:48","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=16487"},"modified":"2023-05-16T05:10:35","modified_gmt":"2023-05-16T05:10:35","slug":"200-mw-solar-project-to-beestablished-in-rajasthans-bikaner","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/200-mw-solar-project-to-beestablished-in-rajasthans-bikaner\/","title":{"rendered":"200 MW solar project to be established in Rajasthan&#8217;s Bikaner"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/16487?pdf=16487\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/SOLAR-PROJECT.jpg\" \/><\/p>\n<p>To establish a 200 MW solar project in Bikaner, Rajasthan, TP Saurya and Tata Power Trading Company Ltd (TPTCL) have inked a power purchase agreement.<\/p>\n<p>A division of Tata Power, TP Saurya Ltd. (TPSL) is a part of Tata Power Renewable Energy Limited (TPREL).<\/p>\n<p>With the most recent victory, TPREL&#8217;s overall renewable energy capacity has increased to 6,788 MW, with 3,917 MW installed (solar 2,989 MW and wind &#8211; 928 MW) and 2,871 MW in various phases of implementation, according to a regulatory filing by Tata Power.<\/p>\n<p>The plant will be commissioned by March 2024. TPTCL has entered into a PPA with TPSL for a period of 25 years, it said adding the project will supply 485 million units of energy annually.<\/p>\n<p>TPTCL is into power trading on exchanges such as Indian Energy Exchange (IEX) and Power Exchange of India Limited (PXIL).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report To establish a 200 MW solar project in Bikaner, Rajasthan, TP Saurya and Tata Power Trading Company Ltd (TPTCL) have inked a power purchase agreement. A division of Tata Power,&#8230; <\/p>\n","protected":false},"author":1,"featured_media":12894,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[1851,1290,1850,1849],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/SOLAR-PROJECT.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16487"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=16487"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16487\/revisions"}],"predecessor-version":[{"id":16510,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16487\/revisions\/16510"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/12894"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=16487"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=16487"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=16487"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}