{"id":16375,"date":"2023-05-09T05:44:34","date_gmt":"2023-05-09T05:44:34","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=16375"},"modified":"2023-05-10T05:46:02","modified_gmt":"2023-05-10T05:46:02","slug":"29-4-megawatt-wind-energy-plant-commences-operation-in-gujarat","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/29-4-megawatt-wind-energy-plant-commences-operation-in-gujarat\/","title":{"rendered":"29.4 megawatt wind energy plant commences operation in Gujarat"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/16375?pdf=16375\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/solar-wind-energy.jpg\" \/><\/p>\n<p>K P Energy Ltd stated that a 29.4 megawatt (MW) wind energy plant in Gujarat has been put into operation.<\/p>\n<p>According to the company&#8217;s regulatory filing, the capacity is a portion of the 250.8 MW ISTS linked wind power project capacity given by Solar Energy Corporation of India Limited (SECI) during Tranche-VIII bidding.<\/p>\n<p>&#8220;In furtherance of phase-I at Sidhpur, KP Energy has successfully commissioned 29.4 MW (phase-II) ISTS (inter state transmission system) connected wind power project comprising 14 numbers of WTGs (wind turbine generators) of 2.1 MW each at Sidhpur site in Devbhoomi Dwarka,&#8221; the statement read.<\/p>\n<p>The net cumulative capacity that has been commissioned as of the current phase-II commissioning is 81.9 MW.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report K P Energy Ltd stated that a 29.4 megawatt (MW) wind energy plant in Gujarat has been put into operation. According to the company&#8217;s regulatory filing, the capacity is a&#8230; <\/p>\n","protected":false},"author":1,"featured_media":3065,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[1803,284],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/solar-wind-energy.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16375"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=16375"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16375\/revisions"}],"predecessor-version":[{"id":16377,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16375\/revisions\/16377"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/3065"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=16375"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=16375"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=16375"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}