{"id":16306,"date":"2023-05-04T04:53:19","date_gmt":"2023-05-04T04:53:19","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=16306"},"modified":"2023-05-05T04:55:04","modified_gmt":"2023-05-05T04:55:04","slug":"leading-renewable-technologies-company-bags-loa-for-solar-project-of-6-5-mw","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/leading-renewable-technologies-company-bags-loa-for-solar-project-of-6-5-mw\/","title":{"rendered":"Leading renewable technologies company bags LoA for Solar Project of 6.5 MW"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/16306?pdf=16306\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/SOLAR-PROJECT.jpg\" \/><\/p>\n<p>A letter of award (LOA) for engineering, procurement, and construction (EPC) services in relation to the establishment of a solar power project with a 6.5 MWp capacity as well as five years of operation and maintenance services has been received by Waaree Renewable Technologies Limited (Formerly known as Sangam Renewables Limited).<\/p>\n<p>According to the terms of the order, the project is anticipated to be finished in F.Y.2023\u20132024.<\/p>\n<p>It may be recalled the Waaree Renewable Technologies had recently announced that it had secured an order towards the construction of a 221.8 MW solar power project for a major Indian steel manufacturer.<\/p>\n<p>The firm will be responsible for the Engineering, Procurement and Construction works of the solar power project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report A letter of award (LOA) for engineering, procurement, and construction (EPC) services in relation to the establishment of a solar power project with a 6.5 MWp capacity as well as&#8230; <\/p>\n","protected":false},"author":1,"featured_media":12894,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[430,429],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/SOLAR-PROJECT.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16306"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=16306"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16306\/revisions"}],"predecessor-version":[{"id":16307,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16306\/revisions\/16307"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/12894"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=16306"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=16306"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=16306"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}