{"id":16304,"date":"2023-05-04T04:48:43","date_gmt":"2023-05-04T04:48:43","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=16304"},"modified":"2023-05-05T04:53:05","modified_gmt":"2023-05-05T04:53:05","slug":"tender-floated-for-2000-mw-grid-connected-solar-power-project-at-khavda","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/tender-floated-for-2000-mw-grid-connected-solar-power-project-at-khavda\/","title":{"rendered":"Tender floated for 2000 MW GRid connected Solar Power Project at Khavda"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/16304?pdf=16304\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/solar-power.jpg\" \/><\/p>\n<p>Gujarat Urja Vikas Nigam Limited (&#8220;GUVNL&#8221;) held an electronic reverse auction in which SJVN Ltd won the 200 MW Grid Connected Solar Power Project at the Khavda Solar Park.<\/p>\n<p>The Company won the entire 200 MW stated capacity at a price of 2.88 per unit via GUVNL&#8217;s open, competitive tariff bidding process on a build-own-operate basis. The Company will create this solar plant in Gujarat&#8217;s Khavda Solar Park. The estimated price tag for this project&#8217;s development is Rs 1,200 crore.<\/p>\n<p>The project is expected to generate 505 million units in 1st year of commissioning and cumulative energy generation over a period of 25 years would be around 11,756 million units. Further, commissioning of the project is expected to reduce 5,76,067 tonnes of carbon emission.<\/p>\n<p>Our vision is aligned with the government&#8217;s vision for a carbon neutral economy. With the allotment of this project, our solar &amp; wind portfolio stand at 17,620 MW out of which 179.5 MW is under operation and rest is under various stages of implementation.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Gujarat Urja Vikas Nigam Limited (&#8220;GUVNL&#8221;) held an electronic reverse auction in which SJVN Ltd won the 200 MW Grid Connected Solar Power Project at the Khavda Solar Park. The&#8230; <\/p>\n","protected":false},"author":1,"featured_media":817,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[361,283],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/solar-power.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16304"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=16304"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16304\/revisions"}],"predecessor-version":[{"id":16305,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16304\/revisions\/16305"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/817"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=16304"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=16304"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=16304"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}