{"id":16263,"date":"2023-05-03T04:45:54","date_gmt":"2023-05-03T04:45:54","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=16263"},"modified":"2023-05-04T04:55:09","modified_gmt":"2023-05-04T04:55:09","slug":"gujarats-surendranagar-to-get-3-mw-series-turbines-to-generate-69-3-mw-wind-power","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/gujarats-surendranagar-to-get-3-mw-series-turbines-to-generate-69-3-mw-wind-power\/","title":{"rendered":"Gujarat&#8217;s Surendranagar to get 3 MW series turbines to generate 69.3 MW wind power"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/16263?pdf=16263\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/Wind-Power-Projects.jpg\" \/><\/p>\n<p>The creation of a 69.3 MW wind power project for Juniper Green Energy Private Limited will use the second order of the 3 MW product series, according to Suzlon Group, a provider of renewable energy solutions.<\/p>\n<p>22 wind turbine generators (WTGs) with a Hybrid Lattice Tubular (HLT) tower and a 3.15 MW rating will be installed by Suzlon. The project will be completed in 2024 and is situated in Gujarat&#8217;s Surendranagar district.<\/p>\n<p>The 3.15 MW S144-140m, the company&#8217;s largest turbine from the 3 MW series, has received its first significant order.<\/p>\n<p>In accordance with the agreement, Suzlon will carry out the project, including erection and commissioning, and provide the wind turbines (equipment supply).<\/p>\n<p>Suzlon will also provide comprehensive operations and maintenance services post-commissioning.<\/p>\n<p>A project of this size can provide electricity to ~57 thousand households and curb ~2.25 lakh tonnes of CO2 emissions per year, the company said in its statement.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The creation of a 69.3 MW wind power project for Juniper Green Energy Private Limited will use the second order of the 3 MW product series, according to Suzlon Group,&#8230; <\/p>\n","protected":false},"author":1,"featured_media":3615,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[1768],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/Wind-Power-Projects.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16263"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=16263"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16263\/revisions"}],"predecessor-version":[{"id":16264,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16263\/revisions\/16264"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/3615"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=16263"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=16263"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=16263"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}