{"id":16212,"date":"2023-04-28T05:10:25","date_gmt":"2023-04-28T05:10:25","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=16212"},"modified":"2023-04-29T05:12:04","modified_gmt":"2023-04-29T05:12:04","slug":"chennai-metro-rail-awards-contract-worth-rs-1134-crore","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/chennai-metro-rail-awards-contract-worth-rs-1134-crore\/","title":{"rendered":"Chennai Metro Rail awards contract worth Rs 1,134 crore"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/16212?pdf=16212\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/02\/Chennai-Metro-Rail.jpg\" \/><\/p>\n<p>Chennai Metro Rail Ltd. and Rail Vikas Nigam Ltd. inked a contract for the building of an elevated viaduct for CMRL Phase-II in the amount of 1,134 crore.<\/p>\n<p>The contract is part of Asian Development Bank funding for Phase-II under the loan agreement.<\/p>\n<p>A press release said the scope of the contract includes construction of an elevated viaduct of approximate length of 10km and nine elevated metro station at Sholinganallur Lake-1, Sri Ponniamman Temple (Sholinganallur Lake-2), Sathyabama University (Semmenchery-2, Gandhi Nagar, Navalur, Siruseri, Siruseri Sipcot-1 and Siruseri Sipcot-2 as well as stablising viaduct at Sipcot.<\/p>\n<p>T Archunan, director, projects, CMRL and Chaudhary Rajneesh Kumar Singh, senior DGM, electrical, BD, RVNL signed the contract.<\/p>\n<p>CMRL said this is the last elevated corridor tender being awarded for the 118.9 km phase-2 project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Chennai Metro Rail Ltd. and Rail Vikas Nigam Ltd. inked a contract for the building of an elevated viaduct for CMRL Phase-II in the amount of 1,134 crore. The contract&#8230; <\/p>\n","protected":false},"author":1,"featured_media":14596,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[285,529],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/02\/Chennai-Metro-Rail.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16212"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=16212"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16212\/revisions"}],"predecessor-version":[{"id":16214,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16212\/revisions\/16214"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/14596"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=16212"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=16212"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=16212"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}