{"id":16173,"date":"2023-04-26T06:04:33","date_gmt":"2023-04-26T06:04:33","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=16173"},"modified":"2023-04-27T06:14:11","modified_gmt":"2023-04-27T06:14:11","slug":"two-lowest-bidders-for-mumbais-11-84-km-thane-borivali-twin-tunnel-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/two-lowest-bidders-for-mumbais-11-84-km-thane-borivali-twin-tunnel-project\/","title":{"rendered":"Two lowest bidders for Mumbai&#8217;s 11.84 km Thane-Borivali twin tunnel project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/16173?pdf=16173\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/04\/Tunnel-Project.jpg\" \/><\/p>\n<p>The building of Mumbai&#8217;s 11.84 km Thane &#8211; Borivali twin tunnel project was announced to have two lowest bidders: Larsen &amp; Toubro (L&amp;T) and Megha Engineering &amp; Infrastructures Ltd. (MEIL).<\/p>\n<p>The Sanjay Gandhi National Park (SGNP) road project by the Mumbai Metropolitan Region Development Authority (MMRDA) would have two 10.8 km long road tunnels underneath it as well as a combined 1 km of approach roads on either end.<\/p>\n<p>The 3 lane tunnels, which connect Magathane&#8217;sEkta Nagar in Borivali and Tikuji-Ni-Wadi at Manpada in Thane, will be constructed utilising 4 giant tunnel boring machines (TBMs) at a maximum depth of 23 metres below the surface.<\/p>\n<p>MMRDA had invited tenders for its civil construction under 2 civil packages in December 2022 with unknown estimates and a 4 year completion deadline. The project\u2019s total estimated cost is Rs. 13,200 crore.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The building of Mumbai&#8217;s 11.84 km Thane &#8211; Borivali twin tunnel project was announced to have two lowest bidders: Larsen &amp; Toubro (L&amp;T) and Megha Engineering &amp; Infrastructures Ltd. (MEIL)&#8230;. <\/p>\n","protected":false},"author":1,"featured_media":15895,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[371,240,1655,1741],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/04\/Tunnel-Project.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16173"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=16173"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16173\/revisions"}],"predecessor-version":[{"id":16174,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16173\/revisions\/16174"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/15895"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=16173"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=16173"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=16173"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}