{"id":16135,"date":"2023-04-25T04:57:47","date_gmt":"2023-04-25T04:57:47","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=16135"},"modified":"2023-04-27T05:00:49","modified_gmt":"2023-04-27T05:00:49","slug":"latest-update-about-four-lane-stretchof-the-nh-731a-in-uttar-pradesh","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/latest-update-about-four-lane-stretchof-the-nh-731a-in-uttar-pradesh\/","title":{"rendered":"Latest update about four-lane stretchof the NH-731A in Uttar Pradesh"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/16135?pdf=16135\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/02\/NHAI-issues-tender-for-four-lane-elevated.jpg\" \/><\/p>\n<p>Infrastructure business PNC Infratech announced that it had got a Letter of Acceptance for a project for Rs 819 crore from the Ministry of Road Transport and Highways (MORTH).<\/p>\n<p>The project involves building a four-lane stretch of the NH-731A in Uttar Pradesh on hybrid annuity mode (Package-II), the business stated in a regulatory filing.<\/p>\n<p>The project will take 24 months to complete once the specified date has passed, and 15 years to operate after that.<\/p>\n<p>The company was awarded the LoA after placing first with the lowest bid (L1) in a project for the Ministry of Road Transport and Highways last month, totalingRs 819 crore.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Infrastructure business PNC Infratech announced that it had got a Letter of Acceptance for a project for Rs 819 crore from the Ministry of Road Transport and Highways (MORTH). The&#8230; <\/p>\n","protected":false},"author":1,"featured_media":4813,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[1726],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/02\/NHAI-issues-tender-for-four-lane-elevated.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16135"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=16135"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16135\/revisions"}],"predecessor-version":[{"id":16136,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/16135\/revisions\/16136"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/4813"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=16135"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=16135"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=16135"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}