{"id":15894,"date":"2023-04-11T04:54:25","date_gmt":"2023-04-11T04:54:25","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=15894"},"modified":"2023-04-12T04:58:05","modified_gmt":"2023-04-12T04:58:05","slug":"two-bidders-compete-for-thane-borivali-tunnel-project-in-mumbai","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/two-bidders-compete-for-thane-borivali-tunnel-project-in-mumbai\/","title":{"rendered":"Two bidders compete for Thane-Borivali Tunnel Project in Mumbai"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/15894?pdf=15894\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/04\/Tunnel-Project.jpg\" \/><\/p>\n<p>Technical bids for the 11.84 km Thane &#8211; Borivali twin tunnel project in Mumbai were opened, and the only two bidders are Larsen &amp; Toubro (L&amp;T) and Megha Engineering &amp; Infrastructures Ltd. (MEIL).<\/p>\n<p>The Sanjay Gandhi National Park (SGNP) will be traversed by two tunnels measuring 10.8 km each, each with a combined 1 km of approach roads on either end, as part of this road project by the Mumbai Metropolitan Region Development Authority (MMRDA).<\/p>\n<p>The three-lane tunnels, which would have a maximum depth of 23 metres below the surface, will link Tikuji-Ni-Wadi at Manpada in Thane and Magathane&#8217;sEkta Nagar in Borivali utilising four gigantic tunnel boring machines (TBMs).<\/p>\n<p>MMRDA had invited tenders for its civil construction under 2 civil packages in December 2022 with unknown estimate and a 4 year completion deadline.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Technical bids for the 11.84 km Thane &#8211; Borivali twin tunnel project in Mumbai were opened, and the only two bidders are Larsen &amp; Toubro (L&amp;T) and Megha Engineering &amp;&#8230; <\/p>\n","protected":false},"author":1,"featured_media":15895,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[371,240,1655,1654],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/04\/Tunnel-Project.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15894"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=15894"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15894\/revisions"}],"predecessor-version":[{"id":15896,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15894\/revisions\/15896"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/15895"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=15894"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=15894"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=15894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}