{"id":15851,"date":"2023-04-08T06:01:42","date_gmt":"2023-04-08T06:01:42","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=15851"},"modified":"2023-04-10T06:05:28","modified_gmt":"2023-04-10T06:05:28","slug":"siemens-rvnl-jv-bags-rs-378-crore-electrification-contract-of-mumbai-metro-line","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/siemens-rvnl-jv-bags-rs-378-crore-electrification-contract-of-mumbai-metro-line\/","title":{"rendered":"Siemens-RVNL JV bags Rs 378 crore electrification contract of Mumbai Metro Line"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/15851?pdf=15851\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/04\/Mumbai-Metro-Line.jpg\" \/><\/p>\n<p>The Mumbai Metro&#8217;s 23.6 kilometre Line-2B&#8217;s overhead electrification (OHE) contract was awarded to Siemens Ltd. and Rail Vikas Nigam Ltd. (Yellow Line).<\/p>\n<p>This elevated route extending south-east from the recently opened 18.6 km Line-2A connects DN Nagar with Mandale (Mankhurd) (Dahisar \u2013 DN Nagar). In 2021, J Kumar Infraprojects acquired from Simplex Infrastructure a piece of the construction project between DN Nagar and MTNL.<\/p>\n<p>In November 2022, the Mumbai Metropolitan Region Development Authority (MMRDA) issued a call for bids for the electrification contract (Package CA-40), with a three-year completion target and an estimated cost of Rs. 443.36 crore. The opening of technical bids in January revealed two bidders: Siemens and KEC.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The Mumbai Metro&#8217;s 23.6 kilometre Line-2B&#8217;s overhead electrification (OHE) contract was awarded to Siemens Ltd. and Rail Vikas Nigam Ltd. (Yellow Line). This elevated route extending south-east from the recently&#8230; <\/p>\n","protected":false},"author":1,"featured_media":15852,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[504,529,253],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/04\/Mumbai-Metro-Line.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15851"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=15851"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15851\/revisions"}],"predecessor-version":[{"id":15854,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15851\/revisions\/15854"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/15852"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=15851"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=15851"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=15851"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}