{"id":15848,"date":"2023-04-08T05:58:39","date_gmt":"2023-04-08T05:58:39","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=15848"},"modified":"2023-04-10T06:01:23","modified_gmt":"2023-04-10T06:01:23","slug":"afcons-infra-bags-rs-6371-crore-civil-contract-of-mumbai-ahmedabad-bullet-train-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/afcons-infra-bags-rs-6371-crore-civil-contract-of-mumbai-ahmedabad-bullet-train-project\/","title":{"rendered":"Afcons Infra bags Rs 6,371 crore civil contract of Mumbai-Ahmedabad Bullet Train project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/15848?pdf=15848\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/04\/Mumbai-Ahmedabad-Bullet-Train.jpg\" \/><\/p>\n<p>Afcons Infrastructure has won the bid to build the 20.377 km subterranean Package C-2 of the 508 km Mumbai-Ahmedabad High Speed Rail after considerable drama in the industry&#8217;s circles (MAHSR Bullet Train).<\/p>\n<p>Package C2 of the main line, which consists of around 3 km of &#8216;undersea&#8217; twin tunnels below Thane Creek, will connect chainage Km 0.773 (BandraKurla Complex Station) to Km 21.150 (Shilphata Ramp). A minimum of three 14.5-meter-diameter Mega TBMs must be used by the assigned contractor.<\/p>\n<p>The National High Speed Rail Company Ltd. (NHSRCL) issued two invitations for bids for this package: one in 2019 that received no responses and another in November 2021 that was subsequently cancelled in February 2022.<\/p>\n<p>For the latest round, bids were invited in September 2022 with a 1888 day (5.17 years) deadline and an unknown estimate. Technical bids were opened in February to reveal 2 bidders \u2013 L&amp;T and Afcons.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Afcons Infrastructure has won the bid to build the 20.377 km subterranean Package C-2 of the 508 km Mumbai-Ahmedabad High Speed Rail after considerable drama in the industry&#8217;s circles (MAHSR&#8230; <\/p>\n","protected":false},"author":1,"featured_media":15849,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[639,1647],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/04\/Mumbai-Ahmedabad-Bullet-Train.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15848"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=15848"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15848\/revisions"}],"predecessor-version":[{"id":15850,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15848\/revisions\/15850"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/15849"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=15848"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=15848"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=15848"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}