{"id":15715,"date":"2023-04-01T08:05:45","date_gmt":"2023-04-01T08:05:45","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=15715"},"modified":"2023-04-01T08:05:45","modified_gmt":"2023-04-01T08:05:45","slug":"11-companies-secure-39600-mw-solar-manufacturing-capacity-under-pli-scheme","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/11-companies-secure-39600-mw-solar-manufacturing-capacity-under-pli-scheme\/","title":{"rendered":"11 companies secure 39,600 MW solar manufacturing capacity under PLI scheme"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/15715?pdf=15715\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Insolation-Vitality-to-establish-photovoltaic-module-manufacturing-factory-in-Rajasthan.jpg\" \/><\/p>\n<p>In the second tranche of the government&#8217;s production-linked incentive (PLI) programme, as many as 11 companies, including <a href=\"https:\/\/www.indosolexports.com\/\">Indosol<\/a>, <a href=\"http:\/\/www.ril.com\/\">Reliance<\/a>, and <a href=\"http:\/\/www.firstsolar.com\/\">First Solar<\/a>, have secured solar photovoltaic manufacturing projects with a combined 39,600 MW capacity.<\/p>\n<p>According to a Power Ministry statement, the PLI Scheme for High-Efficiency Solar PV Modules (Tranche-II) has authorised the government to allot to 11 enterprises a total of 39,600 MW of domestic solar PV module production capacity with a total investment of Rs 14,007 crore.<\/p>\n<p>According to the government, 7,400 MW of manufacturing capacity will be operational by October 2024, 16,800 MW by April 2025, and the remaining 15,400 MW by April 2026.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report In the second tranche of the government&#8217;s production-linked incentive (PLI) programme, as many as 11 companies, including Indosol, Reliance, and First Solar, have secured solar photovoltaic manufacturing projects with a&#8230; <\/p>\n","protected":false},"author":1,"featured_media":8354,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[1612,739],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Insolation-Vitality-to-establish-photovoltaic-module-manufacturing-factory-in-Rajasthan.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15715"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=15715"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15715\/revisions"}],"predecessor-version":[{"id":15716,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15715\/revisions\/15716"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/8354"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=15715"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=15715"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=15715"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}