{"id":15488,"date":"2023-03-23T04:36:40","date_gmt":"2023-03-23T04:36:40","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=15488"},"modified":"2023-03-24T04:38:29","modified_gmt":"2023-03-24T04:38:29","slug":"h-g-infra-engineering-receives-completion-certificate-for-delhi-vadodara-expressway-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/h-g-infra-engineering-receives-completion-certificate-for-delhi-vadodara-expressway-project\/","title":{"rendered":"H G Infra Engineering receives completion certificate for Delhi-Vadodara Expressway project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/15488?pdf=15488\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/expressway.jpg\" \/><\/p>\n<p>For the project involving the construction of an 8-lane access controlled motorway for the Banoli-Jhalai road section of the Delhi-Vadodara Green Field alignment on EPC mode under the Bharatmala Pariyojana in the state of Rajasthan, H. G. Infra Engineering has been awarded the completion certificate.<\/p>\n<p>The project has been given the all-clear to begin operations on February 6th, 2023.<\/p>\n<p>The estimated cost of the project is Rs 880.11 crore.<\/p>\n<p>The project scope included the construction of an eight-lane access-controlled expressway from the start of the RoB near the junction with NH-11A to the junction with MDR-1 (Baonli-Jhalai road) (CH.214.260-247.310) section of Delhi-Vadodara greenfield alignment (NH-148N) on EPC mode under Bharatmala Pariyojna in Rajasthan.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report For the project involving the construction of an 8-lane access controlled motorway for the Banoli-Jhalai road section of the Delhi-Vadodara Green Field alignment on EPC mode under the Bharatmala Pariyojana&#8230; <\/p>\n","protected":false},"author":1,"featured_media":12978,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[978],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/expressway.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15488"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=15488"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15488\/revisions"}],"predecessor-version":[{"id":15489,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15488\/revisions\/15489"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/12978"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=15488"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=15488"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=15488"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}