{"id":15042,"date":"2023-03-01T02:58:02","date_gmt":"2023-03-01T02:58:02","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=15042"},"modified":"2023-03-02T03:01:26","modified_gmt":"2023-03-02T03:01:26","slug":"two-firms-bid-for-mumbai-metros-line-2b-peb-roof-and-finishing-contract","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/two-firms-bid-for-mumbai-metros-line-2b-peb-roof-and-finishing-contract\/","title":{"rendered":"Two firms bid for Mumbai Metro\u2019s Line-2B PEB Roof and Finishing Contract"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/15042?pdf=15042\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><a href=\"http:\/\/www.jkumar.com\/\"><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/The-Mumbai-Metropolitan-Region-Development-Authority-.jpg\" \/>J Kumar Infraprojects<\/a> and <a href=\"https:\/\/www.acilnet.com\/\">Ahluwalia Contracts<\/a> (India) have filed their proposals for the 23.6 km Line-2B (Yellow Line) of the Mumbai Metro, which connects DN Nagar, BKC, and Mandale, pre-engineered building (PEB) roof and architectural finishing contract. The civil construction contract (Package CA-07) for these five elevated stations\u2014located at Shivaji-Chowk, Diamond Nagar, Mankhurd, BSNL, and Mandale\u2014was already granted to NCC Ltd. in April 2019 following numerous rounds of re-bidding. In January 2020, the initial set of U-girders was introduced. The Mumbai Metropolitan Area Development Authority (MMRDA) issued a request for proposals in January 2023 for this contract (Package CA-158), with an estimated value of Rs. 100.30 crore and an undefined completion date.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report J Kumar Infraprojects and Ahluwalia Contracts (India) have filed their proposals for the 23.6 km Line-2B (Yellow Line) of the Mumbai Metro, which connects DN Nagar, BKC, and Mandale, pre-engineered&#8230; <\/p>\n","protected":false},"author":1,"featured_media":13236,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[1413,1171],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/The-Mumbai-Metropolitan-Region-Development-Authority-.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15042"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=15042"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15042\/revisions"}],"predecessor-version":[{"id":15043,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/15042\/revisions\/15043"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/13236"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=15042"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=15042"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=15042"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}