{"id":14884,"date":"2023-02-21T02:56:33","date_gmt":"2023-02-21T02:56:33","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=14884"},"modified":"2023-02-22T03:00:48","modified_gmt":"2023-02-22T03:00:48","slug":"dilip-buildcon-receives-loa-for-rs-1947-06-crore-order","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/dilip-buildcon-receives-loa-for-rs-1947-06-crore-order\/","title":{"rendered":"Dilip Buildcon receives LOA for Rs. 1947.06 crore order"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/14884?pdf=14884\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/Isgec-Heavy-Engineering-Commences-Production-of-Ethanol.jpg\" \/>The letter of acceptance (LOA) from Madhya Pradesh Jal Nigam Maryadit, Bhopal (M.P), has been obtained by <a href=\"https:\/\/www.dilipbuildcon.com\/\">Dilip Buildcon Ltd<\/a> &#8211; Skyway Infraprojects Pvt. Ltd. (Authority). The contract is for the engineering, procurement, construction, testing, commissioning, trial run, operation, and maintenance of various Rewa Bansagar MVS, District Rewa components in a single package on a task-by-task basis, including the trial run, operation, and maintenance of the entire water supply scheme for l0 years. The project would take 24 months to complete and will cost Rs. 1947.06 crore.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The letter of acceptance (LOA) from Madhya Pradesh Jal Nigam Maryadit, Bhopal (M.P), has been obtained by Dilip Buildcon Ltd &#8211; Skyway Infraprojects Pvt. Ltd. (Authority). The contract is for&#8230; <\/p>\n","protected":false},"author":1,"featured_media":3693,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[1375,1376],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/12\/Isgec-Heavy-Engineering-Commences-Production-of-Ethanol.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/14884"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=14884"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/14884\/revisions"}],"predecessor-version":[{"id":14885,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/14884\/revisions\/14885"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/3693"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=14884"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=14884"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=14884"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}