{"id":1458,"date":"2021-10-08T00:00:38","date_gmt":"2021-10-08T00:00:38","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=1458"},"modified":"2021-10-11T06:49:58","modified_gmt":"2021-10-11T06:49:58","slug":"morth-floats-tender-for-the-improvement-of-the-hamirpur-karnohal-section","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/morth-floats-tender-for-the-improvement-of-the-hamirpur-karnohal-section\/","title":{"rendered":"MoRTH floats tender for the improvement of the Hamirpur-Karnohal section"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/1458?pdf=1458\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"alignnone  wp-image-1459 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/bullet-train-300x200.jpg\" alt=\"\" width=\"398\" height=\"265\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/bullet-train-300x200.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/bullet-train.jpg 460w\" sizes=\"(max-width: 398px) 100vw, 398px\" \/><\/p>\n<p>The Ministry of Road Transport and Highways of the Government of India has sought proposals for the upgrade of the Hamirpur-Karnohal Section in Himachal Pradesh.<\/p>\n<p>The scope of work comprises repair and upgrade to two-lane configuration of the Hamirpur-Karnohal Section (141.000 km to 181.000 km) of NH-70 in Himachal Pradesh under the Green National Highways Corridor Project (GNHCP) with World Bank loan support on an EPC basis.<\/p>\n<p>The project&#8217;s projected cost is Rs 290.83 crore, with a completion date of 30 months.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The Ministry of Road Transport and Highways of the Government of India has sought proposals for the upgrade of the Hamirpur-Karnohal Section in Himachal Pradesh. The scope of work comprises&#8230; <\/p>\n","protected":false},"author":1,"featured_media":1459,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/bullet-train.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/1458"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=1458"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/1458\/revisions"}],"predecessor-version":[{"id":1461,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/1458\/revisions\/1461"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/1459"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=1458"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=1458"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=1458"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}