{"id":14506,"date":"2023-02-06T04:38:26","date_gmt":"2023-02-06T04:38:26","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=14506"},"modified":"2023-02-07T04:40:18","modified_gmt":"2023-02-07T04:40:18","slug":"tata-powers-solar-cell-and-module-facility-in-tn-to-be-operational-this-year","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/tata-powers-solar-cell-and-module-facility-in-tn-to-be-operational-this-year\/","title":{"rendered":"Tata Power&#8217;s solar cell and module facility in TN to be operational this year"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/14506?pdf=14506\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/SOLAR.jpg\" \/><\/p>\n<p>Tata Power CEO and MD PraveerSinha stated that the company&#8217;s solar cell and module facility in Tamil Nadu will be operational by the end of this year.<\/p>\n<p>Tata Power signed an agreement with the Tamil Nadu government in July 2022 to invest 3,000 crore in the state&#8217;s Tirunelveli district to establish a new facility to manufacture solar cells and modules.<\/p>\n<p>Construction is currently in full swing. The unit&#8217;s setup equipment has already been ordered. Sinha told PTI that the goal is to have the plant operational by the end of this year.<\/p>\n<p>He made the remarks in response to a question about the project&#8217;s timeline.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Tata Power CEO and MD PraveerSinha stated that the company&#8217;s solar cell and module facility in Tamil Nadu will be operational by the end of this year. Tata Power signed&#8230; <\/p>\n","protected":false},"author":1,"featured_media":13014,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[903],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/SOLAR.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/14506"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=14506"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/14506\/revisions"}],"predecessor-version":[{"id":14507,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/14506\/revisions\/14507"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/13014"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=14506"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=14506"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=14506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}