{"id":13860,"date":"2023-01-24T05:09:20","date_gmt":"2023-01-24T05:09:20","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=13860"},"modified":"2023-01-25T05:12:09","modified_gmt":"2023-01-25T05:12:09","slug":"meghmani-organics-completes-phase-i-of-titanium-dioxide-plant-in-dahej-gujarat","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/meghmani-organics-completes-phase-i-of-titanium-dioxide-plant-in-dahej-gujarat\/","title":{"rendered":"Meghmani Organics completes Phase I of Titanium Dioxide plant in Dahej, Gujarat"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/13860?pdf=13860\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/Meghmani-Organics-completes-Phase-I-of-Titanium-Dioxide-plant-in-Dahej-Gujarat.jpg\" \/><\/p>\n<p><a href=\"http:\/\/meghmani.com\/\">Meghmani Organics Limited<\/a> announced the completion of Phase 1 of its Titanium Dioxide (TiO2) plant in Dahej, Gujarat, with an installed capacity of 16,500 metric tonnes per year (MTPA).<\/p>\n<p>Meghmani paid 132 crore for <a href=\"https:\/\/in.linkedin.com\/company\/kilburn-chemicals-ltd\">Kilburn Chemicals Limited<\/a> in December 2021 as an upfront payment. Following that, the company incurred total capex of Rs.275 crore, including acquisition costs, and completed the first phase in January 2023.<\/p>\n<p>Because of its brightness and strong UV light absorbing capabilities, TiO2 is one of the most widely used white pigments.<\/p>\n<p>It is used to add whiteness and opacity to a variety of products, including paints, coatings, plastics, papers, inks, foods, medicines, and toothpastes.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Meghmani Organics Limited announced the completion of Phase 1 of its Titanium Dioxide (TiO2) plant in Dahej, Gujarat, with an installed capacity of 16,500 metric tonnes per year (MTPA). Meghmani&#8230; <\/p>\n","protected":false},"author":1,"featured_media":13861,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[526,525],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/Meghmani-Organics-completes-Phase-I-of-Titanium-Dioxide-plant-in-Dahej-Gujarat.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13860"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=13860"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13860\/revisions"}],"predecessor-version":[{"id":13862,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13860\/revisions\/13862"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/13861"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=13860"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=13860"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=13860"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}