{"id":13641,"date":"2023-01-19T04:52:26","date_gmt":"2023-01-19T04:52:26","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=13641"},"modified":"2023-01-24T11:34:18","modified_gmt":"2023-01-24T11:34:18","slug":"arunachal-pradesh-likely-to-get-11-gw-hydel-power-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/arunachal-pradesh-likely-to-get-11-gw-hydel-power-project\/","title":{"rendered":"Arunachal Pradesh likely to get 11 GW hydel power project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/13641?pdf=13641\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"\" src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/JSW-Group-plans-to-build-900MW-hydel-power-project-in-West-Bengal.jpg\" width=\"271\" height=\"203\" \/><\/p>\n<p>India is developing an 11,000 MW hydroelectric project on the strategically significant Siang River in Arunachal Pradesh, according to reports.<\/p>\n<p>&#8220;The purpose of the project, apart from generating electricity, is also to control floods,&#8221; sources said, adding that state-owned <a href=\"http:\/\/www.nhpcindia.com\/home.aspx\">NHPC Ltd<\/a> has submitted a pre-feasibility report for the Upper Siang Multipurpose Storage project.<\/p>\n<p>The project, spearheaded by the ministry of jalshakti, will aim at live storage of 9 billion cubic meters of water. The report on the project has been sent to the Central Electricity Authority for approval.<\/p>\n<p>&#8220;The pre-feasibility report for the project was submitted around December end,&#8221; said the person quoted above. &#8220;The next step after its approval would be the pre-detailed project report.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report India is developing an 11,000 MW hydroelectric project on the strategically significant Siang River in Arunachal Pradesh, according to reports. &#8220;The purpose of the project, apart from generating electricity, is&#8230; <\/p>\n","protected":false},"author":1,"featured_media":6845,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[485],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/JSW-Group-plans-to-build-900MW-hydel-power-project-in-West-Bengal.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13641"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=13641"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13641\/revisions"}],"predecessor-version":[{"id":13642,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13641\/revisions\/13642"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/6845"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=13641"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=13641"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=13641"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}