{"id":13628,"date":"2022-12-09T12:26:49","date_gmt":"2022-12-09T12:26:49","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=13628"},"modified":"2023-06-30T07:02:32","modified_gmt":"2023-06-30T07:02:32","slug":"new-projects-by-acume-chemicals-ajay-industrial-corporation-and-anaven","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/new-projects-by-acume-chemicals-ajay-industrial-corporation-and-anaven\/","title":{"rendered":"New Projects by Acume Chemicals, Ajay Industrial Corporation and Anaven"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/13628?pdf=13628\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><a href=\"http:\/\/www.newprojectstracker.com\/projects\/new-projects-by-new-synthetic-organic-chemical-mfg-project-in-bharuch-gujarat-lia31099\"><strong>Acume Chemicals&#8217; New Synthetic Organic Chemical Mfg. Project<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/www.zaubacorp.com\/company\/ACUME-CHEMICALS-PRIVATE-LIMITED\/U24290TN2021PTC148007\">Acume Chemicals<\/a> is planning to take up new synthetic organic chemical manufacturing project in GIDC, Randedi, Taluka Ankleshwar, Dist.: Bharuch, Gujarat. The project involves manufacturing of synthetic organic chemical with the capacity of 51516 TPA. The estimated cost of the project is Rs.1710 million. The company start construction activity on April 2023 and end on October 2023. As of December 2022, environment clearance for the project is underway.<\/p>\n<p><a href=\"http:\/\/www.newprojectstracker.com\/projects\/new-projects-by-new-pipes-&amp;-fitting-mfg-project-in-satara-maharashtra-gva31055\"><strong>Ajay Industrial Corporation&#8217;s New Pipes &amp; Fitting Mfg. Project<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/www.ajayindustrial.com\/\">Ajay Industrial<\/a> Corporation is planning to take up a new pipes &amp; fitting manufacturing project in Plot No 1, Choradia Industrial Park LLP, Village Sangvi, Tal Kandala, Satara, Maharashtra. The project involves manufacturing of pipes &amp; fitting with the capacity of 2400 MT\/M. The estimated cost of the project is Rs.340 million. As of December 2022, the company has received consent from the state pollution control authorities to establish the project.<\/p>\n<p><strong>To access all new projects covered today, download the report<\/strong><\/p>\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/imageedit_1_9992176543.jpg\" \/><\/p>\n<p><strong><a href=\"https:\/\/www.newprojectstracker.com\/online?_ga=2.247560583.1051731023.1665574012-482399943.1663235295\">Download Daily Projects Report \u2013 Issue No : 395<\/a><\/strong><\/p>\n<p>The Daily Project Report compiled from new projects updated on the previous day is sent to all paid subscribers and has 15 New Projects in Energy, Infrastructure, Chemicals, Textiles, Paper, Cement, Steel, Water Treatment and other Manufacturing Projects in India<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Acume Chemicals&#8217; New Synthetic Organic Chemical Mfg. Project Acume Chemicals is planning to take up new synthetic organic chemical manufacturing project in GIDC, Randedi, Taluka Ankleshwar, Dist.: Bharuch, Gujarat. The&#8230; <\/p>\n","protected":false},"author":1,"featured_media":13629,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[10],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/imageedit_1_9992176543.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13628"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=13628"}],"version-history":[{"count":3,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13628\/revisions"}],"predecessor-version":[{"id":17712,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13628\/revisions\/17712"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/13629"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=13628"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=13628"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=13628"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}