{"id":13620,"date":"2022-12-07T11:36:36","date_gmt":"2022-12-07T11:36:36","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=13620"},"modified":"2023-06-30T07:12:20","modified_gmt":"2023-06-30T07:12:20","slug":"new-projects-by-64-mld-stp-at-attapur-amara-raja-batteries-and-avyaya-farms-and-feeds","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/new-projects-by-64-mld-stp-at-attapur-amara-raja-batteries-and-avyaya-farms-and-feeds\/","title":{"rendered":"New Projects by 64 MLD STP at Attapur, Amara Raja Batteries and Avyaya Farms And Feeds"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/13620?pdf=13620\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><a href=\"http:\/\/www.newprojectstracker.com\/projects\/new-projects-by-new-sewage-treatment-plant-in-rangareddy-telangana-gsh31064\"><strong>64 MLD STP at Attapur&#8217;s New Sewage Treatment Plant<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/timesofindia.indiatimes.com\/city\/hyderabad\/attapur-stp-commissioned\/articleshow\/22404996.cms\">64 MLD STP at Attapur<\/a> is planning to take up a new sewage treatment unit in Attapur, Rajendranagar Mandal, Rangareddy, Telangana. The project involves establishment of sewage treatment with capacity 64 MLD. The project is estimated to cost Rs.886.4 million. As of December 2022, the company has received consent from the state pollution control authorities to establish the project.<\/p>\n<p><a href=\"http:\/\/www.newprojectstracker.com\/projects\/new-projects-by-new-lithium-ion-battery-mfg-facility-in-mahbubnagar-telangana-tqk31085\"><strong>Amara Raja Batteries&#8217; New Lithium-Ion Battery Mfg. Facility<\/strong><\/a><\/p>\n<p><a href=\"https:\/\/www.amararaja.com\/\">Amara Raja Batteries<\/a> is planning to take up new lithium-ion battery manufacturing facility in Mahbubnagar, Telangana. The project involves setting up research and manufacturing facilities for lithium-ion battery. The estimated cost of the project is Rs.95000 million. As of December 2022, company signed a memorandum of understanding (MoU) with the Telangana government to set up the project.<\/p>\n<p><strong>To access all new projects covered today, download the report<\/strong><\/p>\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/imageedit_6_6507122957.jpg\" \/><\/p>\n<p><strong><a href=\"https:\/\/www.newprojectstracker.com\/online?_ga=2.247560583.1051731023.1665574012-482399943.1663235295\">Download Daily Projects Report \u2013 Issue No : 393<\/a><\/strong><\/p>\n<p>The Daily Project Report compiled from new projects updated on the previous day is sent to all paid subscribers and has 15 New Projects in Energy, Infrastructure, Chemicals, Textiles, Paper, Cement, Steel, Water Treatment and other Manufacturing Projects in India<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report 64 MLD STP at Attapur&#8217;s New Sewage Treatment Plant 64 MLD STP at Attapur is planning to take up a new sewage treatment unit in Attapur, Rajendranagar Mandal, Rangareddy, Telangana&#8230;. <\/p>\n","protected":false},"author":1,"featured_media":13622,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[10],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/imageedit_6_6507122957.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13620"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=13620"}],"version-history":[{"count":3,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13620\/revisions"}],"predecessor-version":[{"id":17723,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13620\/revisions\/17723"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/13622"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=13620"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=13620"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=13620"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}