{"id":13445,"date":"2023-01-17T06:19:02","date_gmt":"2023-01-17T06:19:02","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=13445"},"modified":"2023-01-24T11:42:53","modified_gmt":"2023-01-24T11:42:53","slug":"waaree-renewable-secures-loa-for-7-mw-solar-power-plant","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/waaree-renewable-secures-loa-for-7-mw-solar-power-plant\/","title":{"rendered":"Waaree Renewable secures LoA for 7 MW solar power plant"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/13445?pdf=13445\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/solar-power.jpg\" \/><\/p>\n<p><a href=\"https:\/\/waareertl.com\/\">Waaree Renewable Technologies<\/a> said that one of India&#8217;s top construction companies has given them a letter of award (LoA) for the construction of a 7 MW solar power plant.<\/p>\n<p>A letter of award (LoA) for the engineering, procurement, construction, and commissioning (EPCC) of a solar power project with a 7 MWp DC capacity for their captive requirement, as well as three years of operation and maintenance work, was signed, the company reported in an exchange filing.<\/p>\n<p>According to the terms of the order, the project is expected to be finished in the FY 2022\u20132023 period.<\/p>\n<p>Waaree Renewables Technology (WRTL) is subsidiary company of Waaree Group and spearheading the solar EPC business. Waaree Group has successfully installed 10,000 plus solar projects, with a total operating capacity of more than 600 MW. The company is also a solar developer that finances, constructs, owns and operates solar projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Waaree Renewable Technologies said that one of India&#8217;s top construction companies has given them a letter of award (LoA) for the construction of a 7 MW solar power plant. A&#8230; <\/p>\n","protected":false},"author":4,"featured_media":817,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[429],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/solar-power.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13445"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=13445"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13445\/revisions"}],"predecessor-version":[{"id":13446,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13445\/revisions\/13446"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/817"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=13445"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=13445"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=13445"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}