{"id":13298,"date":"2023-01-12T11:18:27","date_gmt":"2023-01-12T11:18:27","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=13298"},"modified":"2023-01-25T08:51:11","modified_gmt":"2023-01-25T08:51:11","slug":"nhai-invites-bids-for-six-lane-greenfield-varanasi-ranchi-kolkata-highway","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/nhai-invites-bids-for-six-lane-greenfield-varanasi-ranchi-kolkata-highway\/","title":{"rendered":"NHAI invites bids for six-lane greenfield Varanasi-Ranchi-Kolkata Highway"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/13298?pdf=13298\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/07\/NHAI-grants-financial-closure-for-Dilip-Buildcons-arm.jpg\" \/><\/p>\n<p>As part of the Bharatmala Pariyojana in Jharkhand, the <a href=\"https:\/\/nhai.gov.in\/\">National Highways Authority of India<\/a> (NHAI) has issued an invitation for bids for the building of a six-lane Varanasi-Ranchi-Kolkata Highway (Package 11). (HAM).<\/p>\n<p>The six-lane Greenfield Varanasi-Ranchi-Kolkata Highway would be expanded from Donoreshan village to the NH-20 junction in Bongabar village between kilometre 288.600 and km 325.500 as part of this project.<\/p>\n<p>The length of the development project is 36,900 kilometres.<\/p>\n<p>The project will likely cost $1,394.36 billion. The deadline to submit a bid is February 28, 2023.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report As part of the Bharatmala Pariyojana in Jharkhand, the National Highways Authority of India (NHAI) has issued an invitation for bids for the building of a six-lane Varanasi-Ranchi-Kolkata Highway (Package&#8230; <\/p>\n","protected":false},"author":1,"featured_media":9654,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[509],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/07\/NHAI-grants-financial-closure-for-Dilip-Buildcons-arm.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13298"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=13298"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13298\/revisions"}],"predecessor-version":[{"id":13299,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13298\/revisions\/13299"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/9654"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=13298"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=13298"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=13298"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}