{"id":13112,"date":"2023-01-05T05:59:19","date_gmt":"2023-01-05T05:59:19","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=13112"},"modified":"2023-01-25T10:05:45","modified_gmt":"2023-01-25T10:05:45","slug":"shapoorji-pallonji-oil-gas-to-commence-hydrocarbon-production","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/shapoorji-pallonji-oil-gas-to-commence-hydrocarbon-production\/","title":{"rendered":"Shapoorji Pallonji Oil &#038; Gas to commence Hydrocarbon production"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/13112?pdf=13112\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/SP.png\" \/><\/p>\n<p>The Floating Production Storage and Offloading Unit (FPSO) Armada Sterling V of <a href=\"https:\/\/www.shapoorjipallonji.com\/company\/SPOilAndGas\">Shapoorji Pallonji Oil &amp; Gas (SP O&amp;G)<\/a> has been hooked up at the KG 98\/2 block, offshore Kakinada.<\/p>\n<p>On the second week of December 2022, the FPSO Armada Sterling V arrived at Cluster 2 of the <a href=\"https:\/\/www.ongcindia.com\/\">ONGC<\/a>-owned KG 98\/2 block off the coast of India.<\/p>\n<p>A statement released from the company informs, \u201cOn 28th December 2022, India\u2019s largest FPSO was safely hooked up. She is now prepared to receive hydrocarbons from the field for processing. Despite challenges due to inclement weather, hook-up was achieved in one of the fastest lead times\u201d.<\/p>\n<p>The FPSO has a processing capacity of 60,000 bpd of liquid and 3 MMSCMD of gas and is owned by SP O&amp;G\u2019s 70:30 joint venture with Malaysia\u2019s Bumi Armada group. This is Shapoorji Pallonji\u2019s fourth FPSO, and its third FPSO for the Indian waters.<\/p>\n<p>SP O&amp;G is now ready to commence commissioning of the FPSO. ONGC is expediting its sub-sea activities and is expected to provide hydrocarbons soon, enabling the FPSO to achieve first oil and commence production.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The Floating Production Storage and Offloading Unit (FPSO) Armada Sterling V of Shapoorji Pallonji Oil &amp; Gas (SP O&amp;G) has been hooked up at the KG 98\/2 block, offshore Kakinada&#8230;. <\/p>\n","protected":false},"author":1,"featured_media":13113,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[418,601],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2023\/01\/SP.png","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13112"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=13112"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13112\/revisions"}],"predecessor-version":[{"id":13114,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/13112\/revisions\/13114"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/13113"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=13112"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=13112"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=13112"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}