{"id":12955,"date":"2022-12-29T05:42:35","date_gmt":"2022-12-29T05:42:35","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=12955"},"modified":"2023-01-24T07:55:05","modified_gmt":"2023-01-24T07:55:05","slug":"meil-hcc-bags-mumbai-ahmedabad-bullet-train-bkc-stations-work","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/meil-hcc-bags-mumbai-ahmedabad-bullet-train-bkc-stations-work\/","title":{"rendered":"MEIL-HCC bags Mumbai-Ahmedabad Bullet Train BKC Station&#8217;s work"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/12955?pdf=12955\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/bullet-train.jpg\" \/><\/p>\n<p><a href=\"https:\/\/www.meil.in\/\">Megha Engineering &amp; Infrastructures Ltd.<\/a> and <a href=\"https:\/\/www.hccindia.com\/\">Hindustan Construction Company<\/a> JV won the contract to build Bandra Kurla Complex Station of the 508.17-kilometer Mumbai to Ahmedabad High Speed Rail after submitting the lowest bid (MAHSR Bullet Train).<\/p>\n<p>Cut and cover construction will be used to construct this terminus station of the 1.03 km long Package C1 between chainage -0.255 and 0.775. Six 425m-long platforms will be located within the 467m-long station space to handle 16-coach bullet trains.<\/p>\n<p>In July 2022, India&#8217;s National <a href=\"https:\/\/nhsrcl.in\/en\/home\">National High Speed Rail Corporation Ltd. (NHSRCL)<\/a> issued a new invitation for bids for the civil construction of BKC Station, with an undetermined budget and a 1638 day (4.48 year) target completion date. In November, technical bids were opened, revealing 4 bidders.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Megha Engineering &amp; Infrastructures Ltd. and Hindustan Construction Company JV won the contract to build Bandra Kurla Complex Station of the 508.17-kilometer Mumbai to Ahmedabad High Speed Rail after submitting&#8230; <\/p>\n","protected":false},"author":1,"featured_media":12956,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[241,240,242],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/bullet-train.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12955"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=12955"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12955\/revisions"}],"predecessor-version":[{"id":12957,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12955\/revisions\/12957"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/12956"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=12955"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=12955"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=12955"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}