{"id":12858,"date":"2022-12-26T05:52:50","date_gmt":"2022-12-26T05:52:50","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=12858"},"modified":"2023-01-24T08:31:26","modified_gmt":"2023-01-24T08:31:26","slug":"cmrl-gives-in-principle-nod-for-teynampet-saidapet-elevated-corridor","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/cmrl-gives-in-principle-nod-for-teynampet-saidapet-elevated-corridor\/","title":{"rendered":"CMRL gives in-principle nod for Teynampet-Saidapet elevated corridor"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/12858?pdf=12858\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/CMRL.jpg\" \/><\/p>\n<p>The <a href=\"https:\/\/chennaimetrorail.org\/\">Chennai Metro Rail Limited (CMRL)<\/a> has gave in-principle clearance for the layout and<\/p>\n<p>preliminary design of the planned structure, bringing construction of the elevated corridor from<\/p>\n<p>Teynampet to Saidapet on Anna Salai one step closer to reality.<\/p>\n<p>The clearance was granted by CMRL, subject to a few restrictions, in a letter to the Divisional<\/p>\n<p>Engineer (City Roads), Construction and Maintenance Wing of the Highways Department. This<\/p>\n<p>was necessary because some of CMRL&#8217;s tunnels would be located underneath the corridor.<\/p>\n<p>E.V. Velu, the minister of highways, had stated in the Legislative Assembly in April that the<\/p>\n<p>corridor will be built to help relieve traffic on the road, which was utilised daily by over 2 lakh<\/p>\n<p>motorists.<\/p>\n<p>The four-lane, 3.2-km corridor would allow motorists to cross junctions at Eldams Road, SIET<\/p>\n<p>College, Cenotaph Road, Nandanam, CIT Nagar Third and First Main Road and Todd Hunter<\/p>\n<p>Nagar\u2013Jones Road with ease.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The Chennai Metro Rail Limited (CMRL) has gave in-principle clearance for the layout and preliminary design of the planned structure, bringing construction of the elevated corridor from Teynampet to Saidapet&#8230; <\/p>\n","protected":false},"author":1,"featured_media":12859,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[285],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/CMRL.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12858"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=12858"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12858\/revisions"}],"predecessor-version":[{"id":12860,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12858\/revisions\/12860"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/12859"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=12858"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=12858"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=12858"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}