{"id":12702,"date":"2022-12-19T05:30:17","date_gmt":"2022-12-19T05:30:17","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=12702"},"modified":"2023-01-24T09:20:17","modified_gmt":"2023-01-24T09:20:17","slug":"acme-group-enters-wind-power-sector-with-50-mw-project-in-gujarat","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/acme-group-enters-wind-power-sector-with-50-mw-project-in-gujarat\/","title":{"rendered":"ACME Group enters wind power sector with 50 MW project in Gujarat"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/12702?pdf=12702\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p>With a 50 MW project in Gujarat, ACME Group is making its entry into the wind energy industry. Power Purchase Agreement (PPA) between the group and Gujarat Urja Vikas Nigam Limited (GUVNL).<\/p>\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/POWER-SECTOR.jpg\" \/><\/p>\n<p>Currently, ACME runs solar energy facilities in twelve states and provides electricity to thirteen state discoms.<\/p>\n<p>The first 50 MW grid-connected wind power project won by <a href=\"https:\/\/www.acme.in\/\">ACME Group.<\/a> In light of the company&#8217;s plans to offer solar-wind hybrid and RE RTC power, this is a significant milestone.<\/p>\n<p>According to ACME Group Chief Operating Officer Sandeep Kashyap, this is in keeping with the company&#8217;s goal of becoming a significant RE RTC player.<\/p>\n<p>A tariff-based competitive bidding process for the purchase of electricity from grid-connected wind power projects resulted in the company being awarded the project.<\/p>\n<p>The project is expected to be commissioned within twenty-four months from the signing of the PPA.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report With a 50 MW project in Gujarat, ACME Group is making its entry into the wind energy industry. Power Purchase Agreement (PPA) between the group and Gujarat Urja Vikas Nigam&#8230; <\/p>\n","protected":false},"author":1,"featured_media":12703,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[360,361],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/POWER-SECTOR.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12702"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=12702"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12702\/revisions"}],"predecessor-version":[{"id":13777,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12702\/revisions\/13777"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/12703"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=12702"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=12702"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=12702"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}