{"id":12700,"date":"2022-12-16T11:29:34","date_gmt":"2022-12-16T11:29:34","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=12700"},"modified":"2023-01-24T09:21:06","modified_gmt":"2023-01-24T09:21:06","slug":"sjvn-green-energy-achieves-financial-closure-of-its-1000-mw-solar-power-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/sjvn-green-energy-achieves-financial-closure-of-its-1000-mw-solar-power-project\/","title":{"rendered":"SJVN Green energy achieves financial closure of its 1000 MW solar power project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/12700?pdf=12700\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/solar.jpg\" \/><\/p>\n<p>SJVN Green Energy, a wholly owned subsidiary of the Company accomplished a major millstone of financial closure of its 1,000 MW solar power project under execution at Bikaner, Rajasthan.<\/p>\n<p>The EPC contract of this project has been awarded to Tata Power Solar Systems. Total cost of the project is Rs 5,723.59 crore. The project is being financed at a debt equity ratio of 80:20.<\/p>\n<p>The Government of India will be funding the viability gap of Rs 447.20 crore. The entire debt of Rs 4,444.71 crore has been tied up with IREDA including bridge loan of Rs 223.60 crore against the viability gap funding.<\/p>\n<p>The project is scheduled to be commissioned on 3 January, 2024.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report SJVN Green Energy, a wholly owned subsidiary of the Company accomplished a major millstone of financial closure of its 1,000 MW solar power project under execution at Bikaner, Rajasthan. The&#8230; <\/p>\n","protected":false},"author":1,"featured_media":12482,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[283,362],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/solar.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12700"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=12700"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12700\/revisions"}],"predecessor-version":[{"id":12701,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12700\/revisions\/12701"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/12482"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=12700"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=12700"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=12700"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}