{"id":12488,"date":"2022-12-08T08:37:03","date_gmt":"2022-12-08T08:37:03","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=12488"},"modified":"2023-01-25T10:20:46","modified_gmt":"2023-01-25T10:20:46","slug":"india-to-build-new-transmission-lines-with-rs-2-4-lakh-crore","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/india-to-build-new-transmission-lines-with-rs-2-4-lakh-crore\/","title":{"rendered":"India to build new transmission lines with Rs 2.4 Lakh crore"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/12488?pdf=12488\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/Transmisson.jpg\" \/><\/p>\n<p>R.K. Singh, the Union Minister for Power and New and Renewable Energy, unveiled the &#8220;Transmission System for Integration of over 500 GW RE Capacity by 2030&#8221; proposal on December 8.<\/p>\n<p>The Ministry of Power established a high-level group to develop this plan for the transmission system needed to add 500 GW of non-fossil fuel capacity by 2030.<\/p>\n<p>The chairman of the Central Electricity Authority is a member of the committee, along with representatives from the National Institute of Solar Energy, <a href=\"https:\/\/www.ctuil.in\/\">Central Transmission Utility of India Ltd<\/a>, <a href=\"https:\/\/www.powergrid.in\/\">Power Grid Corporation of India Ltd<\/a>, and <a href=\"https:\/\/niwe.res.in\/\">National Institute of Wind Energy<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report R.K. Singh, the Union Minister for Power and New and Renewable Energy, unveiled the &#8220;Transmission System for Integration of over 500 GW RE Capacity by 2030&#8221; proposal on December 8&#8230;. <\/p>\n","protected":false},"author":1,"featured_media":12489,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[635,637,636],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/Transmisson.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12488"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=12488"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12488\/revisions"}],"predecessor-version":[{"id":12490,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12488\/revisions\/12490"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/12489"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=12488"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=12488"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=12488"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}