{"id":12476,"date":"2022-12-07T11:06:09","date_gmt":"2022-12-07T11:06:09","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=12476"},"modified":"2023-01-25T10:25:12","modified_gmt":"2023-01-25T10:25:12","slug":"hitachi-secures-chennai-metro-rail-tender-worth-rs-1620-crore","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/hitachi-secures-chennai-metro-rail-tender-worth-rs-1620-crore\/","title":{"rendered":"Hitachi secures Chennai Metro Rail tender worth Rs 1,620 crore"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/12476?pdf=12476\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/Rail.jpg\" \/><\/p>\n<p>The task of installing signalling and train control systems that would permit operation of driverless trains on the118.9km phase-2 corridors has been given to a consortium made up of Hitachi Rail STS SPA and <a href=\"https:\/\/www.hitachirail.com\/\">Hitachi Rail STS India Pvt Limited.<\/a><\/p>\n<p>The 1,620cr deal is <a href=\"https:\/\/chennaimetrorail.org\/\">Chennai Metro Rail Limited<\/a>&#8216;s largest signalling tender to date (CMRL). Phase 2 of the 118.9 118.9km phase-2 corridors has been given to a consortium made up of Hitachi Rail STS SPA and\u00a0 km three-corridor project should be completed by 2026.<\/p>\n<p>The design, production, supply, installation, testing, and commissioning of the signaling, train control, and video management systems for phase-2 are covered by the contract<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The task of installing signalling and train control systems that would permit operation of driverless trains on the118.9km phase-2 corridors has been given to a consortium made up of Hitachi&#8230; <\/p>\n","protected":false},"author":1,"featured_media":12477,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[285,646],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/12\/Rail.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12476"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=12476"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12476\/revisions"}],"predecessor-version":[{"id":12478,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12476\/revisions\/12478"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/12477"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=12476"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=12476"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=12476"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}