{"id":12414,"date":"2022-12-06T05:20:30","date_gmt":"2022-12-06T05:20:30","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=12414"},"modified":"2023-01-25T10:49:28","modified_gmt":"2023-01-25T10:49:28","slug":"sojitz-corporation-and-lt-jv-bag-mumbai-ahmedabad-bullet-train-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/sojitz-corporation-and-lt-jv-bag-mumbai-ahmedabad-bullet-train-project\/","title":{"rendered":"Sojitz Corporation and L&#038;T JV bag Mumbai- Ahmedabad bullet train project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/12414?pdf=12414\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/LT-awards-Zetwerk-contract-of-Rs-126.55-crore-for-bullet-train-project.jpg\" \/><\/p>\n<p>In relation to the proposed Mumbai-Ahmedabad bullet train project, Larsen and Toubro (L&amp;T) disclosed that it has won a sizable contract.<\/p>\n<p>The commissioning of a Gujarat depot covering over 82 hectares is part of the project allocated by the National High-Speed Rail Corporation, the business stated in a stock exchange statement.<\/p>\n<p>The company has not yet disclosed the order&#8217;s value. A significant project is defined by the company as one that costs between Rs 2,500 crore and Rs 5,000 crore.<\/p>\n<p>&#8220;The buildings and factories business of L&amp;T Construction has secured an order from the National High-Speed Rail Corporation Limited (NHSRCL) to construct the Sabarmati Depot (MAHSR &#8211; D-2) in Gujarat for the (MAHSR project through a consortium led by Sojitz Corporation, Japan,&#8221; the company stated in a release.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report In relation to the proposed Mumbai-Ahmedabad bullet train project, Larsen and Toubro (L&amp;T) disclosed that it has won a sizable contract. The commissioning of a Gujarat depot covering over 82&#8230; <\/p>\n","protected":false},"author":1,"featured_media":6820,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[311,309],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/04\/LT-awards-Zetwerk-contract-of-Rs-126.55-crore-for-bullet-train-project.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12414"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=12414"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12414\/revisions"}],"predecessor-version":[{"id":12415,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12414\/revisions\/12415"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/6820"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=12414"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=12414"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=12414"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}