{"id":12408,"date":"2022-12-06T05:00:54","date_gmt":"2022-12-06T05:00:54","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=12408"},"modified":"2023-01-25T10:52:03","modified_gmt":"2023-01-25T10:52:03","slug":"adani-green-commissions-third-hybrid-plant-in-rajasthan","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/adani-green-commissions-third-hybrid-plant-in-rajasthan\/","title":{"rendered":"Adani Green commissions Third  Hybrid plant in Rajasthan"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/12408?pdf=12408\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/03\/Adani-Green-Energy-wins-LoA.jpg\" \/><\/p>\n<p><a href=\"https:\/\/www.adanigreenenergy.com\/\">Adani Green Energy Ltd<\/a> (AGEL) announced the commissioning of its third hybrid power plant in Rajasthan, which has a 450 megawatt generating capacity (MW).<\/p>\n<p>With a 1,440 MW operational capacity, <a href=\"https:\/\/www.adanigreenenergy.com\/\">AGEL<\/a> claimed this made it the &#8220;world&#8217;s largest wind-solar hybrid power developer.&#8221;<\/p>\n<p>&#8220;At Jaisalmer, <a href=\"https:\/\/www.adanigreenenergy.com\/\">AGEL<\/a> has put into service its third wind-solar hybrid power plant. This recently installed hybrid power plant has a total operational generation capacity of 450 MW. With SECI, the plant has Power Purchase Agreements (PPA) for 25 years at Rs 2.67\/kwh &#8220;In a statement, <a href=\"https:\/\/www.adanigreenenergy.com\/\">AGEL<\/a> stated.<\/p>\n<p>This project includes 420 MW of solar power and 105 MW of wind power.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Adani Green Energy Ltd (AGEL) announced the commissioning of its third hybrid power plant in Rajasthan, which has a 450 megawatt generating capacity (MW). With a 1,440 MW operational capacity,&#8230; <\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[393],"jetpack_featured_media_url":"","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12408"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=12408"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12408\/revisions"}],"predecessor-version":[{"id":12409,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12408\/revisions\/12409"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=12408"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=12408"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=12408"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}