{"id":1240,"date":"2021-09-28T00:00:33","date_gmt":"2021-09-28T00:00:33","guid":{"rendered":"https:\/\/newprojectstracker.com\/blog\/?p=1240"},"modified":"2022-04-18T05:29:47","modified_gmt":"2022-04-18T05:29:47","slug":"yotta-infra-to-invest-rs-900-crore-in-edge-datacenter-network-2","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/yotta-infra-to-invest-rs-900-crore-in-edge-datacenter-network-2\/","title":{"rendered":"Yotta Infra to invest Rs 900 crore in Edge datacenter network"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/1240?pdf=1240\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"alignnone wp-image-1241 aligncenter\" src=\"https:\/\/newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/yotta.jpg\" alt=\"\" width=\"381\" height=\"381\" srcset=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/yotta.jpg 300w, https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/yotta-150x150.jpg 150w\" sizes=\"(max-width: 381px) 100vw, 381px\" \/><\/p>\n<p>The Hiranandani Group&#8217;s Yotta Infrastructure would invest Rs 900 crore over three to four years to build 100 Edge datacenters.<\/p>\n<p>The firm would begin with eight to ten cities, with each facility costing around Rs 8 to 10 crore for basic infrastructure. The business is looking at 25 minor cities in Phase-I, including Nagpur, Coimbatore, Ranchi, Jaipur, and Jaipur.<\/p>\n<p>The company operates Tier IV data centre parks in Mumbai, Navi Mumbai, and Chennai. Two versions have been developed by the business. In the first scenario, an edge datacenter will be established in an existing building. According to rumours, the second model will be a container-based greenfield project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report The Hiranandani Group&#8217;s Yotta Infrastructure would invest Rs 900 crore over three to four years to build 100 Edge datacenters. The firm would begin with eight to ten cities, with&#8230; <\/p>\n","protected":false},"author":1,"featured_media":1241,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2021\/10\/yotta.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/1240"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=1240"}],"version-history":[{"count":2,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/1240\/revisions"}],"predecessor-version":[{"id":6682,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/1240\/revisions\/6682"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/1241"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=1240"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=1240"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=1240"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}