{"id":12288,"date":"2022-11-28T05:12:23","date_gmt":"2022-11-28T05:12:23","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=12288"},"modified":"2023-01-24T11:21:39","modified_gmt":"2023-01-24T11:21:39","slug":"waaree-renewable-technologies-ltd-receives-loa-for-solar-power-project","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/waaree-renewable-technologies-ltd-receives-loa-for-solar-power-project\/","title":{"rendered":"Waaree Renewable Technologies Ltd receives LOA for Solar Power Project"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/12288?pdf=12288\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"\" src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Tata-Power-Renewables-inaugurates-120MW-solar-project-in-Gujarat.jpg\" width=\"298\" height=\"166\" \/><\/p>\n<p><a href=\"http:\/\/www.waareertl.com\/\">Waaree Renewables Technologies Limited (WRTL)<\/a>, (formally known as Sangam Renewables Ltd) is a subsidiary company of Waaree Group and spearheading the Solar EPC business.<\/p>\n<p>Waaree Group has successfully installed over 10000 solar projects, with a total operating capacity of 600+ MW.<\/p>\n<p>The company has received a Letter of Award (LoA) from a leading steel industry player for executing Engineering, Procurement, and Construction (EPC) works for a solar power project with a capacity of 52.5 MWp DC along with provision of land, infrastructure and approvals for 70 MWp DC. PO will be issued by the customer pursuant to LoA.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report Waaree Renewables Technologies Limited (WRTL), (formally known as Sangam Renewables Ltd) is a subsidiary company of Waaree Group and spearheading the Solar EPC business. Waaree Group has successfully installed over&#8230; <\/p>\n","protected":false},"author":1,"featured_media":7599,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163,146],"tags":[474,473],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/Tata-Power-Renewables-inaugurates-120MW-solar-project-in-Gujarat.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12288"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=12288"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12288\/revisions"}],"predecessor-version":[{"id":12289,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12288\/revisions\/12289"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/7599"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=12288"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=12288"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=12288"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}