{"id":12137,"date":"2022-11-18T12:09:34","date_gmt":"2022-11-18T12:09:34","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=12137"},"modified":"2023-01-25T09:33:53","modified_gmt":"2023-01-25T09:33:53","slug":"chennai-metro-rail-phase-ii-will-have-a-double-decker-line","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/chennai-metro-rail-phase-ii-will-have-a-double-decker-line\/","title":{"rendered":"Chennai Metro Rail Phase II will have a double decker line"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/12137?pdf=12137\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img class=\"\" src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/07\/Chennai-Airport-Kilambakkam-Metro-project-all-set-to-begin.jpg\" width=\"486\" height=\"303\" \/><\/p>\n<p>For a distance of around 5 km, the Chennai Metro Rail will have a double decker line with station standing in a single pillar.<\/p>\n<p>Four stations along this stretch\u2014at Alwarthirunagar, Valasaravakkam, Karambakkam, and Alapakkam\u2014shall be built at two levels, and there will be a shared concourse (ticketing level) with two distinct platforms.<\/p>\n<p>According to a release from Chennai Metro Rail Ltd., an unique Launching Girder has been made and is prepared for usage to carry out the same (CMRL)<\/p>\n<p>CMRL commenced expansion of the metro rail network as a part of Phase II after the successful completion of the Phase I and Phase I Extension Corridors in stages since June 2015.<\/p>\n<p>Many balanced cantilever method spans are being adopted as special spans to suit the site conditions. Out of all, the challenging location will be Kathipara Junction with five spans, said T Archunan, Director (Projects), CMRL, in the release.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report For a distance of around 5 km, the Chennai Metro Rail will have a double decker line with station standing in a single pillar. Four stations along this stretch\u2014at Alwarthirunagar,&#8230; <\/p>\n","protected":false},"author":1,"featured_media":9974,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[285],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/07\/Chennai-Airport-Kilambakkam-Metro-project-all-set-to-begin.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12137"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=12137"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12137\/revisions"}],"predecessor-version":[{"id":12138,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12137\/revisions\/12138"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/9974"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=12137"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=12137"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=12137"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}