{"id":12062,"date":"2022-11-14T10:24:09","date_gmt":"2022-11-14T10:24:09","guid":{"rendered":"https:\/\/www.newprojectstracker.com\/blog\/?p=12062"},"modified":"2023-01-25T09:55:15","modified_gmt":"2023-01-25T09:55:15","slug":"rk-singh-asks-ntpc-to-more-than-double-capacity-by-2030","status":"publish","type":"post","link":"https:\/\/www.newprojectstracker.com\/blog\/rk-singh-asks-ntpc-to-more-than-double-capacity-by-2030\/","title":{"rendered":"RK Singh asks NTPC to more than double capacity by 2030"},"content":{"rendered":"\n\n\n\t<div class=\"dkpdf-button-container\" style=\" text-align:right \">\n\n\t\t<a class=\"dkpdf-button\" href=\"\/blog\/wp-json\/wp\/v2\/posts\/12062?pdf=12062\" target=\"_blank\"><span class=\"dkpdf-button-icon\"><i class=\"fa fa-file-pdf-o\"><\/i><\/span> Download PDF Report<\/a>\n\n\t<\/div>\n\n\n\n\n\n<p><img src=\"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/TANGEDCO-to-complete-existing-power-projects-by-2024.jpg\" \/><\/p>\n<p>R K Singh, the minister of state for energy, ordered <a href=\"https:\/\/www.ntpc.co.in\/\">NTPC<\/a> to more than double its capacity by 2030. At the 48th Raising Day of <a href=\"https:\/\/www.ntpc.co.in\/\">NTPC<\/a> here, he predicted that by the year 2030, India&#8217;s installed power capacity would reach 800 GW.<\/p>\n<p>He stated, &#8220;<a href=\"https:\/\/www.ntpc.co.in\/\">NTPC<\/a> must contribute at least 25% to 800 GW level.&#8221;<\/p>\n<p><a href=\"https:\/\/www.ntpc.co.in\/\">NTPC<\/a> currently has 70,000 megawatts of installed capacity, which includes thermal and renewable sources.<\/p>\n<p><a href=\"https:\/\/www.ntpc.co.in\/\">NTPC<\/a> must increase its capacity as the demand for power will continue to grow in India and the company must eye for a larger share in the market, he said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Download PDF Report R K Singh, the minister of state for energy, ordered NTPC to more than double its capacity by 2030. At the 48th Raising Day of NTPC here, he predicted that&#8230; <\/p>\n","protected":false},"author":1,"featured_media":8284,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":""},"categories":[163],"tags":[237],"jetpack_featured_media_url":"https:\/\/www.newprojectstracker.com\/blog\/wp-content\/uploads\/2022\/05\/TANGEDCO-to-complete-existing-power-projects-by-2024.jpg","acf":[],"_links":{"self":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12062"}],"collection":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/comments?post=12062"}],"version-history":[{"count":1,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12062\/revisions"}],"predecessor-version":[{"id":12063,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/posts\/12062\/revisions\/12063"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media\/8284"}],"wp:attachment":[{"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/media?parent=12062"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/categories?post=12062"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newprojectstracker.com\/blog\/wp-json\/wp\/v2\/tags?post=12062"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}